My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/3/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/3/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:18:38 PM
Creation date
5/9/2018 2:36:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/03/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MashiDee Libre - Design VE Modifications - Update Post 4130108 MeelLng <br /> DD Estimate Review Modifications and Agreed VE Oi)tions <br /> Page Ref. Description Savings Comments <br /> 2 128 Use CC berm instead ofconcrete 3,600.00 Agreed <br /> 2 105 Use CC bean instead ofconcrete 16,000.00 Agreed <br /> 2 103 Use CC berm instead of concrete 948.00 Agreed <br /> 3 341 Provide alternate light for SL3 fixture 3,200.00 Agreed <br /> 3 343 Provide alternate light for SL3 fixture 1,204.00 Agreed <br /> 27929526538,40 Provide alternate exterior wall finish in leu ofstore 160,000.00 Go with 50/50 masonry to wood siding. <br /> 47 Use aluminum flashing in leu ofcopper 18,655.00 Agreed <br /> 202 Eliminate roof access hatch 2,500.40 Agreed <br /> 9 22 Reduce interior glazed walls by 30% 14,574.40 Review interior finish schedule <br /> 14 1,2 Cut back on terrazzo floor the and add carpet 33,400.40 Agreed <br /> 13 191 Reduce quantity of window shades to south side only 16,400.40 Agreed <br /> Current Total of Redu ctions $269,677.00 A total o $693,926.04 in VE options were presented <br /> to the Committee on 4/30/08. <br /> Total of Reductions <br /> Revised Estimate Sub-Total $26%677.00 <br /> Flus General Conditions at 8.5% 223,922.55 <br /> Plus Bond and Insurance at 1.5% 4,388.99 <br /> Plus 0 &P at 5.0% 145849.43 <br /> Sub-Total $311,837.97 <br /> Plus Escalation Estimate $12,473.52 6%per year to raid roje t 8mths <br /> Grand Total $3241311.48 <br /> Pomroy Associates-Mashpee Library DD Estimate Comments-4/29/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.