Mash Pubtic Lila PCO/Chan a Order L0q _ 8/31/09 <br /> DESCRIPTION Issue <br /> Date Reason For Change Original Final Charge <br /> !Value Value Class <br /> P. D1 Electric rima installationori inall b MSP 12123100 MSP was originally to install and ML to share in 50/50 cost. $33,023,60 $23,588.00 Scope <br /> PCO2 Curbing along Stee le Street and in entrance drive. 2112109 Scheduled to be completed by MCLP.Put pdoing together to help them out. 13,153.00 0,00 rola <br /> CEI Structural Steel Modifications 2/'18109 Elements of structural steel which did not et in�or orated ire f <br /> anal desi n. 11,904.00 11,904,00 Design <br /> PC03 (levator Vent Modifications 4/16/09' Credit:Reduced height of structure which chary es frarnin <br /> r-nopercladdn -080.00 -1,080.00 Design <br /> PD4 Roof Flashing4110109 Exploring the option to uEgrade the roofing flashings from aluminum to coRper. 4,90 . 0 5,477.00 Upgrade <br /> PS Recessed X11 kabinet 4!29109 Provide a recessed area in the millwork to accommodate a new inform . <br /> ational screen. 0.00 0.00 Upgrade <br /> PD�fi halt Shingles Reist�r� 4121I�} Upgrade roofing stem to accommodate 1210 Mph wind rating.. 9,758.79 10,9021.00 Design <br /> PD7 Window Treatment Revisions - 5!12109 credit: Eliminate North faiding window shades.Add on South face. -2r500.00 -7QO.00 Design <br /> PCO8 HVAC Revision 5113109 Added HVAC syppiy supplyat Bu i(ding Storage Room 113 <br /> 1,1 .} 1,180.00 Design <br /> PD09 Elevator Electrical Revisions 5113109 Credit,Changes to the main distribution panel due to reduced elevator star re uirements. {955.00 -9 .00 Design <br /> I"' 10 Site Lighting Revisions11109 credit:Reduce number of side walk poles ontee le and change e at entrance drive. -8,049.00 -3,049.00 Design <br /> P11 P Mounting 5127!09 rales required to tae P1 su ortto roof structure. 18,000.00 12,2214.00 Design <br /> PD12 Door Hardware Revisions 5/27/09 <br /> Dolts associated with providing, 3 additional doors with securiac <br /> cess control. 0.00 5,067.00 Desi n <br /> CES CAD design time inured by HVAC sub. 6118109 Time invested by HVAC sub-contractor to coordinate ductwork for D. 3,001,00 3,01.00 Desi n <br /> P13 Revisions to ceiling desi n ire children's Area 6124109 JR recoornanded simplifying the ceiling system ager <br /> seeing the product submittals. 0',00 0.00 Design Not r� <br /> PDO 14 Provide backflow preventer for boilers. 717109 <br /> Required by code. <br /> 2,038.07 2,038.07 Design <br /> PCO 15 Electrical floor box revisions in You nq Adult Room 718109 Revisions as a r suit of furnishings meetings. <br /> - <br /> DE15 Lower openings at 2nd floor windows 7f7109 M is-com m u n ication between the Arch end GC that was not docum -208.81 -208.51 Design <br /> anted-with an RFI 2,27 ,00 -2,274.00 Design <br /> P 16 Door 111 Access control 815!09 Cost associated with providingcorrect infrastructure at D - <br /> oor 111 500.00 0.00 Design <br /> PCS 17 P Ir�ve�#ers Discor�r�eots 8110109 N STAR reg uiras exterior disconnect switches located next to meter for <br /> each anertr 1,788.00 0.09 Design <br /> PDQ 18 Induction units at 202&2107 811109 Splitting one unit into two will allo'rceiling heights is to remain as showy in drawings 0,00 0.00 Design <br /> E##21 Added baby char ging station 8/10109 flans call for"By Owner'.Asked GC for pdce to keep consistan <br /> tri#h #her 285.00 285.04 Scope <br /> u ort system fog recast amyls at entrance. 8/10!00 Issue between,arch and Filed-sub as to responsibility. RP su ested 50180 to <br /> move on. 5,000.00 0.00 <br /> Relocation of FA Cabinet 8112109 Needed to be done to clear the donor wail space.TQM <br /> 500.00 0.00 Upgrade <br /> Rolling shelving rails. 511109 � Needed becouse room is larger than in the old fibra storage room. <br /> 1,100.00 0.00 Upgrade <br /> Provide wiring for hand driers ire bathrooms. 8120109 <br /> Requested by Town to upgrade from hand towels to driers. <br /> 1,800.00 0.00 UEgrade i <br /> Totals $9.9,996.45 '$72,927.56 <br /> Totals by_ YranaCly Comments <br /> Scope $23,873.00 <br /> Non-Scope 0.00 <br /> Design 43,577.56 <br /> Upgrade 5,477.90 <br /> Total $72,9217,58 <br /> Chan ge Order Reca Q Status <br /> o#1 $35,492.00 Approved <br /> 302966.00 Approved <br /> CO#3 51355.00 Approved <br /> CO 4 2,014.56 Pending approval <br /> Po rn roy Associates-Most Recent Report 7-31-09 Tota! $72,927.56 <br />