My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/8/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
10/8/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:22:31 PM
Creation date
5/9/2018 2:36:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/08/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENERGY UPDATE <br /> 10-8-09 <br /> 4 <br /> Renewable wind Projects <br /> Large Scale Wird Turbine <br /> The Town received a grant through the Massachusetts Technology Collaborative MTS <br /> for completion of a grind turbine feasibility study on Town lands. Eight locations were <br /> evaluated by Weston & Sampson, the consultant for the project.' The initial investigation <br /> found only 2 of the 8 locations to be feasible because ofFederal Aviation Ad i i tr.ation <br /> (FAA) height restrictions. These two locations—1lashpee High/Middle School and <br /> South Cape Beach—were presented to the Board of Selectmen at their meeting on <br /> October 5h. The BOS voted to focus further evaluation on the High Middle School <br /> location. <br /> Clean Enemy Choice Fund <br /> The Town has approximately $17, 0 available through the Clean Energy Choice CC <br /> Fund (monetary match for purchase of"green" electricity by Mashpe properties). The <br /> program has been discontinued and the funds must be co=- itted by the Town for <br /> imp lernentation of a clean energy project Ioverber The Selcctnenvoted <br /> n October 5hto use these funds.for the purchase oft o Windspires, small vertical axis, <br /> ground-mounted wind turbines. The Windspires will be located at the Mashpee MashWelcome <br /> Center on Route 130. The to30-foot tall turbines will generate up to 4,000 kWh o <br /> electricity annually or approximately '3 of the building's electrical use. The Town i <br /> finalizing costs for the purchase and installation of the Windspires. The project may be <br /> combi ed with a rebate to allow purchase of a third turbine. <br /> Renewable Solar Projects <br /> Solar Photovoltaic Systems on Town Hall and Senior Center <br /> A.Request for Bids will be released within the next week for the installation a <br /> combined 80 kW system on roofs of the two buildings. The project will be funded <br /> through a Power Purchase Agreement (PPA.). A private company will design, permit, <br /> procure, install, and maintain the systems on the two buildings for a multi-gear period. <br /> The company wil1 receive any incentives from the Comrnonvealth Solar program for the <br /> installations. The Town will purchase the electricity generated by the panels for the <br /> duration of the PPA. for a fixed rate of$0.15 per kWh. Upon the expiration of the PPA, <br /> the Town will own the systems. <br /> Solar Photovoltaic (PV) ysten at HilMil shoo <br /> A site assessment was recently completed for installation of PV panels on the <br /> High/Middle School roof`: 1t was determined that up to a 262 kW system could be. <br /> ,installed. The Ton has submitted a request to the Cape & vineyard Electric <br /> Cooperative CVEC for funding of a system. The Town will also be submitting a <br /> preliminary application for funding through the Energy Efficiency and Conservation <br /> Block Grant through MA Executive office of Energy and Environmental Affairs <br />
The URL can be used to link to this page
Your browser does not support the video tag.