My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/27/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
1/27/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:05:32 PM
Creation date
5/9/2018 2:44:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/27/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
j <br /> $60,000 appropriation for Building Needs Survey <br /> ul1drg <br /> Library 2010 <br /> Fire Station #2 2008 <br /> Chamber of Commerce 2007 renovation <br /> Senior Center 2005 <br /> Fire Station #1 2001 <br /> Police Station 2000 renovationaddition (1 978 original) <br /> High/Middle School 1996 <br /> Town Hall 1996 renovation <br /> Kids Klub 1992 renovation <br /> Transfer Station 1989 <br /> DPW 1986 <br /> Quashnet School <br /> Coombs School <br /> Archives <br /> Issues <br /> Police Shingle roof(shingles over old section are coning up or are <br /> missing) <br /> High/Middle School Rubber roof(lewing, warranty expiring) <br /> Town Dail Rubber membrane roof(lower roof leaking, warranty <br /> expiring) <br /> Energy management system(EMS; some components have <br /> already been completed; replacement of thermostats with <br /> compatible units will be 6ompleted through Cape Light <br /> F Compact) <br /> Quashnet School Rubber membrane roof(leaking) <br /> , - Cafeteria HVAC (roof unit notr m* for 10+years, <br /> there is not sufficient perimeter heat, a system is also <br /> needed ix the adjacent boiler room which is not getting <br /> sufficient fresh air for it to fire correctly) <br /> irdos (frames are deteriorating and rusting, resultmg in <br /> significant heat loss) <br /> Coombs School Rubber membrane roof(leaking) and gutters none <br /> HVAC (entire building) and EMS (system currently shut - <br /> on/off by brewers <br /> Archives lav (building currently has one ductless wall unit on <br /> each floor; the system is not maintaining proper climate <br /> control for archival storage) <br />
The URL can be used to link to this page
Your browser does not support the video tag.