Laserfiche WebLink
:a <br /> Villa a Place 1448 Turnpike Street,Suite -iL I South Ea Ston,MA 02375#T 508/238-,0401 F 508/238-504 <br /> associa es www.pomr'oyassociates.com <br /> Mashpee Librall .Loject U <br /> .Rdate <br /> -Meedu Azenda <br /> January 27,2010 :3pm <br /> Town Qfficials Present <br /> Joyce Mason L ] Rend Read L ] Catherine Laurent[ l Helene DFe [ l <br /> Committee Members Present <br /> Steve Cook,Chairman[ ],Iry Goldberg,Nice Chairman[ ],Janice Mills,Clerk� ], <br /> Joe Krait[ ],DJ Ellis [ ], Sheldon Gilbert Tricia.Parolski[ ],Eugene Smargon[ ]. <br /> Marra ement Team Present <br /> Richard Po roy[ ],Taylor MacDonald I ]. <br /> Agenda <br /> 1. January 2010 Activities — Sub-committee meetings were held on 1/7 and 1/21. Construction meetings were <br /> held on 1/7, 1115 and 1/21. PA conducted coordination meetings l ashpee signage vendor on 1/7 and IT on <br /> 1779 1115 and 1/21. 1rlashpee's phone vendor was on site on 1/14 to install their rack gear. Mashpee Fly <br /> perforin d Fire Alarm inspection on 1121 and Verizon began its cabling on 1/21. <br /> Progress for the month consisted of; EXTERIOR—No work other than infill of brick pavers at North entrance <br /> and the North entrance Mashpee Public Library lettering was installed. INTERIOR — The interior finishes <br /> continued while the mechanical, electrical and plumbing systems were completed tested and started up. The <br /> Owner's alarm system components and wireless antenna were installed,the fire alarm was tested and certified, <br /> the elevator was completed and will be inspected on 1/28, the HVAC system was completed, tested and <br /> balanced, the boiler flue was lowered and all remaining millwork items were delivered and the majority <br /> installed. Punch list inspections began on 1/22 and will carry through to the fiat week in February. The <br /> Certificate ofOccupancy is expected on Friday 1729/1 . The first delivery of Owner furnishings was <br /> completed on 1120 and installation of the Children's stack shelving took place. The second floor shelving was <br /> also delivered and stored in the 1"floor lobby waiting for the elevator to become active. <br /> Milestones for the end of this month are; 1727 - Verizon and Carousel to complete phone lire install ars <br /> activate service, 1/28 — Final elevator inspection and final fire alarm inspection, punch lists, 1/29 — All 2�d <br /> floor stags get shipped up to 2d floor, Substantial Completion established. <br /> . Projected February 2010 Activities — Sub-committee meetings are scheduled for 214 and 21 . burinthe <br /> month of February we expect that all construction r1 and punch list will b 100% complete y Feb 15 t and <br /> the building completely turned over to Mashpee by mid month. The remaining Owner training for the H A , <br /> Electrical and Photovoltaic Systems will be completed during the month. We expect Owner's furnishings to <br /> ramp up during the month and expect to be 0%complete with the furnishings install by the end of the month. <br /> Also, during February FA will be putting the finishes touches on the turn-over packages for the owner. <br /> . Construction Schedule—The contractor will meet the new January 29ffi Substantial Completion deadline and <br /> will be 100%complete by mid February 2010. <br /> . Substantial Completion./Certificate of occupancy — Substantial Completion will be obtained by January <br /> 29th. As soon as the Occupancy Permit is issued a copy will be delivered to Joyce Mason for implementation of <br /> the building insurance and for all intensive purposes the building will be under the operation of the Town. we <br /> will not accept the turnover of the building until all systems are 100% complete and signed off on by the <br /> engineers and the training sessions have been successfully completed. <br /> Po rcy Associates—Project Update-Library--1/27/10 Update Meeting Agenda Page 1 of <br />