My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/25/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
2/25/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:08:23 PM
Creation date
5/9/2018 2:45:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
eshpee Outstanding iters Log 2/2511 <br /> Mashpee Library OutstandinaItems Log Throuqh ComDleti6n Undated 2125110 <br /> Description Acton Current Status <br /> 3 <br /> 1 Fla Ver radius wall Bufftree I Capeway Copper to be used, expected credit from Capeway <br /> 32 East parking striping Bufftree Included in exterior building finish <br /> 33 Attic stack Bufftree Complete except for paint <br /> 34 Exterior buiidin finish Bufftree Pending warm weather <br /> 6 LEED flush out Buffiree Requirements reviewed,to take place after painters are done.Start week of 318110 <br /> 36 LEED Certification final submission J 1 PA Final components related to GGD commissioning <br /> 37 Ca 2e Cod Alarm, CCA I PA 9%Complete, Monitoring to begin during March <br /> 36 Alarm system trainin2. CCA Deeds to be completed prior to opening <br /> 39 Dedication plaque location Town deeds to be anchored to Masonry <br /> 0 2 storage units in AV browsing Tucker er 1 Town Are 2 shelving storage units needed in the AV browsing room <br /> 1 Window treatments Buff ree Started 2123110 <br /> 42 Plants in Bio-retention s ale Bufftree JR May need to be integrated to increase integrity of soil <br /> 43 Cut down drain receiver at after hrs Bufftree George to complete <br /> 44 Paint radiant unit panels- <br /> BufFtr a bleed to also be caulked, paint same color as ceiling . <br /> 45 Invite ADA to open`in 116/1 0 HID Helens to coordinate <br /> 6 thermostat Buf r Current location in way of kitchen refrigerator <br />
The URL can be used to link to this page
Your browser does not support the video tag.