My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/25/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
2/25/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:08:23 PM
Creation date
5/9/2018 2:45:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Outstanding Iters Log 2/25/10 <br /> Mashnee Libraty-Outstandina Items Log _ Throaah Completion Vpdated 2125110 <br /> -Description Acton Current Status <br /> Phone system install Carousel PA Rack gear-installed, phones integrated once construction activities are 100%complete <br /> 2 Comcast DD/CL 3 cables brought into building, interfaces need to be terminated <br /> Clams DD/CL N eds to be coordinated with Corricast install <br /> Events room-IT DD Power and data requirements installed. Room ready for integration <br /> Coat hangers in tech services PA Will review with Helene <br /> 11 .B Mason delive outstatnd ire 11 .B PA Dhildreh's wing items to be delivered 3!1110 <br /> 7 Worden end-panels returned Wren 28 items haat to be returned to worden for finishing,expected back 313/10 <br /> Office Environment delive E PA Taking delivery 2126/10 <br /> Creative Library Conceets delivery CLC PA Taking deliver 3/8/10 <br /> 10 Book stack sl2nage Tucker order placed. Expected in 2-3 weeks <br /> 1 S Desi n PA Pricing quote expected back this week. Fabrication and install to follow <br /> 12 Refrigerators, dishwasher, copiers CL 1 copier delivered. Other items pending <br /> 13 ! FID book tagging HD ngoi'ng. Conversion lease expires 319110 <br /> 14 RFI D circulation desk integration P / Buffiree PA,met with 3M tech. Buff#ree to carry out fitting system into countertop <br /> 15 Porting of Ubraaphone numbers Carousel/ DD PA coordinated the date of 3126110 <br /> . 16 Computers DD Computers purchased, David to receive shipment and implement <br /> 17 Network DD David to connect this with all other Town buildings <br /> 18' Change mailing address/website H D/DD deeds to be done prior to opening <br /> 19 Solar trainin9 Bufftree Training is pending fire wall issue <br /> 20 P l Fat s} aniel integration B ufl"tree Will be completed once fire wall is opened <br /> 1 Solar rebate submission P Towyn Can be submitted once Fat Spaniel systema is reporting,Town hes till 612!10 to submit <br /> 2 Owner move Town To be completed during month of March <br /> 23 Computer management software Bufftree 1 Town Millwork modification complete, Brite Lite to install power&data requirements <br /> 24 Fina unch lists J / PA Stewart Roberts to complete 2124110 <br /> 6 Building turnover to town Bufftree 2126110 with lochs on the doors ane!•painting complete <br /> 6 Building Looks Bufl'tree TCl Bufftree working with Cheviot and TCl to accomplish this <br /> 27 Final cleaning Bufrtree Cleaning started week of 2115/10 and is ongoing <br /> 26 Commissioning finish Bufftree/GGD HVAC outstanding,GGD punch list items to be completed before this can be finished <br /> 29 Follow up ina fions of punch 'items J 1 PA After all punch list items are marked as complete <br /> Turn over documents PA Collection of Material ongoing. Submittal file cabinets given to CL. <br /> y <br />
The URL can be used to link to this page
Your browser does not support the video tag.