My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/23/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
3/23/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:10:30 PM
Creation date
5/9/2018 2:45:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/23/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l lashpee outstanding Items Log 3/23/10 <br /> Mashvee Library Outstandina Loa <br /> Uatedd 3123110 <br /> Description Action Current States <br /> 31 Flashing over radius wall Bufftree/Capeway Copper to be used expected credit from Capeway <br /> 32 East parkj.ng striping Bufftree COMPLETED, look of touching up during landscape finish <br /> 33 Attic stock BufftreeCOMPL <br /> ETE <br /> 34 Exterior building finish Buffiree Started 312211{x, Exp ected finish 3126110 <br /> 35 LEED flush out Bufftree Flush out Started 311110. Painters 100%319110 <br /> 36 LEED Certification final submission JFK / PA Final components;GGD commissioning(flush-out end)&Buffiree submitted material <br /> 37 Cape Cod Alarm, CCA 1 PA COMPLETED <br /> 38 Alarm system training_ CCA Brad Trip has completed this training. CCA has made themselves available for HD and staff <br /> 39 Dedication plaque location Town COMPLETED <br /> 40 2 storage units in AV browsing vorden 1 Town PO issued to Worden 3/22 <br /> 1 Window treatments Bufftree COMPLETED <br /> 42 Plants in Bio-retention swale Bufftree/J Hardwood d nnuich to be used week of3/22 <br /> 3 Cut down drain receiver at after hrs Bufftree <br /> George to complete <br /> 44 Paint radiant unit pals $ufftree Need to also be caulked,paint same color as ceiling <br /> 45 Invite ADA to op nin2 4/16/10- HD Helene to coordinate <br /> 46 'Move thermostat and phone jack Bufftree COMPLETED <br /> 47 Exterior building Lunch list JR To be COMPLETED week of 3129 by Stewart Roberts <br /> Land apin uncle list J / KA To be COMPLETED week of 3/29 by Kim Ahern <br /> 49 Shelf at circulation desk PA 1 Bristol Request sent to Bufftree,pricing received back from Bristol50 . <br /> Tiles in program room B ufftree if tiles do not correct themselves,Bufftree to correct <br /> 1 Door sweeps at main doors Bufftree George to complete this week 3/22 <br /> 55 Small David Edwards Chairs A Wrong chairs delivered, Stewart sorting this out with David Edwards <br /> Additional stacks and shelving CL At l A and children's, PO issued to Tucker 3119110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.