My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/23/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
3/23/2010 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:10:30 PM
Creation date
5/9/2018 2:45:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/23/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Outstanding Items Log 31 l <br /> mashnee L.ibrafy outstandina Items Log Throu.Uh <br /> Descripticin ire By Current Status <br /> Phony system install Carousel PA COMPLETED <br /> comcast DD/CL <br /> Clams DD/CL COMPLETED <br /> Events room 1T/Malley Comm-C , DD COMPLETED <br /> Coat hangers in tech services COMPLETEDSLIP <br /> Catherine buying looks <br /> W.B Mason d liv out tandin W.B PA <br /> 1�ord n end panels returned Wordon COMPLETED <br /> S <br /> COMPLETED <br /> . Office Environments dliv E 1 PA COMPLETED <br /> Creative Library Concepts delivery CLC P <br /> 10 Book stack signage Tucker COMPLETED <br /> COMPLETED1 1 in Design � PA In falrioation <br /> In sta11 end of week 3122-beginning of week 3/29 <br /> 12 Refrigerators, di h r h r, Copiers CL <br /> 13 I FID book tagging- HD COMPLETED <br /> ee Ongoing at r� library, lase extended to Iglu 0 <br /> 1 FID circulation desk int ration P / u tr <br /> is Porting of Library phone numbers Carousel 1 DD COMPLETED <br /> '� Computers DD <br /> To be COMPLETED 3126/10 <br /> Network DD <br /> '� " <br /> Computers currently being implemented <br /> - <br /> 18 Change mailing address/website HD/DD David to connect this with all other Town buildings <br /> 19 Solar training Buffiree <br /> Leeds to be done prior to opening <br /> 20 P 1 Fat spaniel integration Bufftree COMPLETED <br /> 1 Solar rebate ubmi ionI COMPLETED <br /> � /Town l� fir�alrfng, reei�rd final door from tri lite tod�y l <br /> Owner move - Town 2311 <br /> 23 Computer management software red DD/Town <br /> To b COMPLETED 124110 <br /> iPLETED, ready for system to be implemented <br /> - � Finf punch lists JI / P <br /> Building25 turnover to townCPL�T�D <br /> ufftree COMPLETED 3110/lo <br /> 26 Building Locks <br /> Buffitree TSI C1�P�.EfiE�3 <br /> 27 North entry needs to b remedied-Door concepts onsite 3118110 <br /> Final Ianin Bufftr'e <br /> 28 Commissioning finishC COMPLETED <br /> Bufftree COMPLETED 311 ill <br /> 29 Follow up inspections of punch iters JR / PA <br /> 0 Turn over documents COMPLETED <br /> ' Collection of Material ongoing.Submittal file o bin t igen <br /> � to CL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.