<br /> DESCRIPTION IssueIF - Reason For Change Original Flr�a! 7lass�tar� eRata ValueValue Current 1
<br /> PCO 21 second floor water cooler ---
<br /> ved 1
<br /> 911410 "'Chilled'component of original water cooler would not fit due to a cross brace 0.00 ,157. 0 DesignApproved �
<br /> PSD 22 Tile at donor wail 9/10109 ire q uested by tine Friends of the L i brary.2cst construction start, 1,620.00 1,620.00 ) rade rove
<br /> CE d 1.
<br /> # lollln shelving rails. 511l9lecessa to accommodate new room size with old lRbr u! Trent, 1,100.00 1,319. 0 Upgrade Approved 1i
<br /> PCO 20 Support system for precast panels at entrance. 8119109 Issue between Arch and Filed-sub as to responsibility.FSP suggested 50150 to move on, 5,000.{0 5,254.00 Scope
<br /> Approved 1
<br /> E 7 Paint b owner 9!17109 ecifications call for" wI? r'{to ravide exterior trim aint 1,485. 0 1,48 ,00 cca A Approved 11
<br /> PCS Flooring upgrades 10/1100 Change After Hours entry hallway from Ft to slate. 6,419,00 5,708.00 Upgrade� roved 1:
<br /> E x#29 Remove an additional 10 trees along 181. 10126109 Trees are just be and clearing irrrtjt but are at risk due to grading changes in area. 3,159.00 2,234.00 Upgrade ra
<br /> ved 1;
<br /> E#30 Provide interface low voltage w ring, 10/27/09 Re ulred for door controls,not shown on dra in s. 6 831.00 Design
<br /> Approved 1:
<br /> CE#36 HandicaR sidewalk Modifications, 11111/09 Necessary to make grades work aloe -Steeple Street and to keep a curb reveal. 2,250.00 2,250.00 Upgrade- Approved 1
<br /> E#31 Block in and flash masonEy returns. 11/1109 Necessary to close in several areas where masonry/siding masonry/sidinginterface could not be resolved. 1,776.00 1,776,00 Design
<br /> Approved 1
<br /> E#34 Added duct work in boiler room. 11120109 Necessa to dediacte make-u p air and avoid R i Re freezes. 515.00 515.00 Desi n
<br /> roved I
<br /> CE#35 Added mulch along east boundary 1111109 Necessary to dress u p area where lainally would have had a sidewalk, 2,000.00 2,541.00 -Upgrade
<br /> Approved
<br /> CE#40 Shop finish millwork desks rather than field 12123/09 F eccomended by cont for and architect for better finish of millwork items. 796.00 796.00 Upgrade_ roved 1,
<br /> E#42 Field modify FP8 fixture 1212109 Necessar
<br /> y to work in ceilin g with HVAC reg is#er. 349,00 349:00 Design
<br /> Approved 1,
<br /> E#38 j Chant g a location of Events Room p ro'edor 12/4109 Necessary becous a drop from ceiling would have been too far and wcutd have interferred with fighting' 3,052.00 3,052.00 Upgrade Recdorrtertded f
<br /> POO 24 Revisions to donation paver and brictc avers. 10/14109 Deduce donation aver amounts and change base desi n. O.DO .00 Design
<br /> No Dost ct��
<br /> Site work performed in MCLP's area of work. 1116109 MCLP's responsibility but we performed to properly finish off area, 700.00 0.00 Upgrade Costs covers
<br /> d in PO
<br /> E#41 Add electric and HVAC for copier in Rm 115 12/24109 Requested by Library staff to get copier in workroom rather general public area. 2,454.00 827.00 Upgrade
<br /> Approved
<br /> CE 37 Lower Boiler flue. 12114109 Costs associated with to er#n the bonier flue for betterappearance on outside of 842.00
<br /> - - Id _ 542.00 Des /�
<br /> afj
<br /> r�� ,,r yq��� ` ' Y ��`• _. ��. _ � n Approved 1�
<br /> �'� ..����;s•'�}'' .� 'f- rs,.��7r. 's0w •T•��#�•ti ••�.z.`-""-a S.i. v¢ - -• _
<br /> } {{ g
<br /> e FbWp�
<br /> ,'ter
<br /> d _ i_•t -.
<br /> _ J
<br /> � :3' Y sYs�Fir
<br /> CE 9 I�11iJ1 tiIS.work adds
<br /> and credits, 12115/09 Deleat north en dis is case,add Friends bookcase,add draws in desks, 3.601,20 ,O .D� Upgrade Approved �
<br /> CE#44 ditfonal ower and io -voltage whin 1l �I10 � #fie aired to fully integrate Owners securi system and due to change in alarm signalling, 1,733.00 1,733.00 URgrade -
<br /> Recoomertded f+
<br /> CE#45 Costs assoictated with addict a 1 hr ceiling, 1125/10 Ceiling required in Solar Room to Meef code.Ori ictal plans did not include. 1,000.00 1,000.00 Design
<br /> Reccamencled fc
<br /> E#43 Added power,low vola a and rn illwork chant es. 3/12110 Reguired to intergrate Owner's computer management system on second floor. 1,210.00 1,210,00 UpQrade
<br /> Re=ornended f(
<br /> E#46 Dain stair changes. 12129/09 Required to eliminate flamable cork board and add maple panelinq and millwork trim. 2,019.00 2,019.00 - Design_ leccomended fc
<br /> CE#47 Main rete tion desk change 311/10 Needed for bookdrop system to work effectively. 1,195.00 1,196.00 Upgrade
<br /> Reccornended fc
<br /> To� S149,236.01 1119,613.00
<br /> Totals by Change-Class: Change Order Recap
<br /> Scope $31,453.00 Go#1
<br /> Nora-Scope 0.00 CO#2
<br /> Design 50,030.00 CO#3
<br /> Upgrade 38,130.00 CO#4
<br /> Total $'119,61300 co#5
<br /> co#6
<br /> CO#7
<br /> o##8
<br /> Total
<br /> Pomroy Associates-!Most Re cent Deport 3-23-14