mashpee Public Libr r - PCO/Chan Order L - 3/22/10
<br /> # DESCRIPTION EsBeason For Change Original _ Final Change
<br /> Date Value Value Class Current St
<br /> PCO1 Electric primary installation OdRinally-by[ CLP 12123108 I I LP was originalIX to install and ISL to share in 50150 cost. $33,023.80 $23.888.00 Scope A rov(
<br /> PCO2 Curtin along Steeple Street an.d in entrance drive. 2009 Scheduled to be completed by MCLP,Put pricing together to help them out. 13,153.00 0.00 nla No response frc
<br /> E#1 Structural Steel MDdificabons 2118/09 Eiernents of structural steel which did not get incorporated in final deal n. 11,804.00 11,904.00 Design Approw
<br /> PCO3 Elevator Vert Modifications- 4/16109 Credit:Reduced height ht of structure which changes framing&copper cladding -880.00 -1,080.00 Design Approve
<br /> PC 04 Roof Flashing 4116109 Explodng Explodethe option to upgrade the roofin2 ffashin s from aluminum to copper. 4,803.80 6,477.00 UpQrade Approw
<br /> PCO5 Recessed TV Cabinet 4128109 Provide a recessed area in the millwork to accommodate:a new informational screen. 0.00 0.00 Upgrade Approved,8/6
<br /> PCC6 Asphalt Shingles Revision 4129100 Upgrade roofing.system to accommodate 120 Mph wird rating. 9,758.79 10,902.00 Design Approw
<br /> P 07 Window Treatment revisions 5112109 Credit.Eftinate North facing window shades.Add(2)on South face, -2,500.00 -700.00 Design Approved,813,
<br /> PCMB I�IVAC Revision 5113109 ,
<br /> 8113109 Added HVAC sW pely at Buildin tcra a Room 113 1,130.00 1,180.00 -Design Approve
<br /> PC09 Elevator Electrical revisions 5[13109 Credit,Chan es to the main distribution panel due to reducedelevator requirements. -956.00 -966.00 Design rovE
<br /> PC010 Site Ljghfin2 Revisions - 8119/09 Credit:Reduce number of side walk Roles on Stec le and chane type at entrance drive, 3,049.00 -3,049.00 Design AperoviE
<br /> PC011 PV Mounting 5127109 Upgrades re aired to tie PV supports to roof structure.
<br /> 15,000.00 12,224.00 Design Approve
<br /> PCO12 Door Hardware Revisions Ions 5127109 Costs associated with providin 2{8)additional doors with se cy rity access control. 0.00 5,387.00 Design rove
<br /> E#8 CAD design time incurred by HVAC sub. 8/18109 Time invested by HVAC sub-contractor to coordinate ductwork for GGD. 3,081.00 3,081.00 Design Approved,712)
<br /> PCO13 Revisions to ceffin2 design in Children's Area 0!24109 Credit:JR recommended simpli 'n2 the ceiling system after seeing the product submittals, , . Desin. Approved,1018
<br /> PCO 14 Provide bacftow preventer for boilers. 7[7109 Fie: uired by code. 2,633.07 2,445.00 Desi tt Approved,8131
<br /> PCO 18 Electrical floor box revisions In Young Adult Doom 715109 Credit:Revisions as a result of fumishins meetings. -208.81 i -209.00 Design A2proved,9/3)
<br /> CE#15 Lower openings at 2nd floor windows 717[09 Mis-communication between the Arch and GC that was not documented with an RFI 2,274.00 2,274.00 Design Approved,816
<br /> PCO 16 Boar 111 Access Control 815109 Cost associated with Rroviding correct infrastructure at Boor 111 500.00 0.00 Desi 2n Approved,9/31
<br /> PCO 17 PV Inverters Disconnects 6/10109 NSTAR re wires exterior disconnect s%WAchek located next to meter for each inverter 1,758.00 1,788.00 Design A roved 1 C
<br /> PCO 18 Induction units at 202&207 8118109 Selitting one unit into two will allow ceiling heights to retrain as shown in drawings 9,238.00 0.00 Design F e'ectei
<br /> CE x#21 Added LLbxchanginQ station 8110109 Plants call for"By Owner'.Asked GC for price to keep consistent with other(2). 288.00 285.00 Scope Approved,8/31
<br /> CE#22 Disconnect switches at chiller 8/16108 8 pecified chiller was submitted with sin R Ie point connection,chiller on site ha:�two p pint connection 1,000.00 0,00 OC Re'ectei
<br /> E#23 Relocation of FA Cabinet,pull station, strobe - 8112/09 Needed to be done to clear the donor walls pace.T&M 500.00 574.00 Upgrade Approved 1 C
<br /> PCO 19 Provide wirira p for hand driers in bathrooms, 8120109 Re nested b y Town to a pg rade from hand towels to driers. 1,500.00 4,568.00 Upgrade Approved 1 C