My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/16/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
8/16/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:15:44 PM
Creation date
5/9/2018 2:51:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/16/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Planning and Construction Committee <br /> Minutes of Meeting Held Tuesday,August 16,2011 <br /> Town Hall,Meeting Room I <br /> Committee Members Present: Steve Gook,Irving Goldberg,Eugene Smargon, and Janice Mills <br /> ,(arrive 6.45 p. . . <br /> Absent: Joe Krait. <br /> Also Present: Catherine Laurent,DPW <br /> Audience: Geoff Spillane—Mashpee Enterprise <br /> Chairman Steve Cook called the meeting to order at 6:35 p.m. <br /> Approval of minutes <br /> �■ a i.■r■� <br /> Irving Goldberg motioned to accept the minutes of the fleeting of July 21,2011 as written;Eugene <br /> 'Smargon seconded the motion. <br /> Vote: 3 Yes. Janice Mills had not yet arrived. <br /> Steve Cook,yes <br /> Irving' oidber ,yes <br /> Gene Smargon,yes. <br /> Old Business <br /> Catherine Laurent distributed written updates on the Town Solar; Careen Community;and Roof projects. � <br /> The-written updates are attached to the printed set of these minutes. 'Below are additional continents that <br /> -were addressed during-the meeting on-these projects. <br /> Solar Projects on Town Buildig&s <br /> Electrical shutdown at the school will be from 8 a.m.to 3 p.m. Catherine said NStar said they <br /> have to do the shutdown so they can be sure mcter ,etc. are working properly. <br /> Town Hall structural testing and analysis report was received today. <br /> The structural testing and analysis reports that Town Hall roof can accommodate system of 6. <br /> ps . Both Steve Cook and Irving Goldberg expressed concern and said that is a fight rnum er. <br /> 'Catherine said obviously they counted on snow. i <br /> 9 Iry Goldberg asked: what about the load the Senior Center will take`? Catherine responded that <br /> they did analysis and that should not be an issue. <br /> • Iry said'he is not impressed with that contractor. Catherine said," ee',that is the feeling and <br /> Joyce Mason is setting up a meeting on this with them to discuss the Town Hall and Senior <br /> Center projects. <br /> 0 Higlh-School analysis was done on the High School roof. Cathenne said she rill provide a copy <br /> of the report to Irv. Catherine mentioned that the High School was built i <br />
The URL can be used to link to this page
Your browser does not support the video tag.