Laserfiche WebLink
KCC <br /> Shingle work completed; membrane work began 7-23-11 <br /> AHU replacement being coordinated (see above) <br /> Credits/deducts to be tracked until end of project: 3 to date (remove/replace warped plywood; <br /> replace ridge gent with new design; replace all gutters with standard aluminum gutter); 1 <br /> potential (add soffit vents) <br /> Leak in library area on 8-2-11; no damage <br /> Leak in front. ntr rn n.8-7-11; no damage <br /> No leaks detected from -1 -11 storm <br /> QS <br /> Work to begin week of 8-15-11 <br /> HS/MS <br /> Torn did not accept quote from Corolla to strip in new seams for non-solar roofs; Corolla t <br /> submit quote for repair of sections with roof leaks detected by infrared scan and visible <br /> y <br /> PCC <br /> I <br /> -16-11 <br />