Torn Buildin . olar <br /> High/Middle School <br /> Construction meeting held 8-1-11 with Borrego Solar, Town and School Officials <br /> New seams completed by Corolla Roofing completed week of -25-11 <br /> Electrical shutdown with NSTR scheduled for 8-1 -11 <br /> Project on schedule for completion by 8-26-11 <br /> Town Hall <br /> Structural testing and analysis completed 8-16-11; roof can accommodate system of 6.5 psf <br /> Under design <br /> Senior Center <br /> Under design <br /> Green Communities Pro'ects- HVAC <br /> MPD- Boiler Replacement <br /> . <br /> Kit---AHU Replacement- <br /> Rooftop AHU removed from roof <br /> New duct being fabricated in Corolla Roofing contract) <br /> Project on schedule for completion b 8-26-11 <br /> Roof Pr .j cts <br /> TH - Membrane Replacement <br /> I CC-Shingle and Membrane Replacement <br /> CSS- Membrane Repair <br /> Req.uistion ##8 from Corolla submitted for payment of$41,354.00 1 <br /> "d invoice from Pomroy Associates submitted for payment of$9,928.69 (60%) <br /> Tern Hall <br /> Membrane work completed; required metal work began 8-18-11; cupola work to begin by 8-22- <br /> 11 <br /> Credits/deducts to be tracked until end of project: 5 to date <br /> Leak outside Torn Clerk's Office on 8-2-11; source identified as roof drain to be <br /> repaired/replaced; ceiling tile damage <br /> Leak into Assessors' Office on 8- -11; source identified as roof drain to be repaired/replaced <br /> and new flashing; new drain installed and flashing re-installed; water tested and okay; <br /> restoration cost to be paid by Corolla and their insurance <br /> Additional small leaks detected (4 location) on 8-1 -11.; source identified as wall under <br /> construction; covered 8-15-11 and wall construction completed 8-16-11; ceiling tile damage <br /> PCC 8-15-11 <br />