MASHPEE ZONING BOARD OF APPEALS
<br /> MEETING MINUTES
<br /> JUNE 13, 2018
<br /> Mr. Richard Moore, 21 Hamblin Road approached the Board and is concerned about the
<br /> widow's walk and he wanted to know about the 20-day appeal period. He asked if there
<br /> would be another hearing.
<br /> Mr. Mendoza told Mr.Moore that the only time there would be another hearing if he makes
<br /> the determination that the application is not in compliance with zoning. The applicant can
<br /> either agree to his decision, or apply for an administrative appeal. If there is an
<br /> administrative appeal, yes, he would be notified,
<br /> Mr. Goldstein read the Board of Health comments into the record.
<br /> Sharon read the Conservation comments into the record.
<br /> Mr. Gould read the Inspection Department comments into the record.
<br /> There were no more comments from the Board.
<br /> Mr. Bonvie made a motion to issue a Written Finding to the applicants of 11 Hamblin
<br /> Road.
<br /> I. The Board has determined that the applicant meets all the conditions of a Written
<br /> Finding under Mass General Law 40A Section 6.
<br /> 2. Proposed. Site Plan — Cape & Islands Engineering, for Jacques & Martha Morin,
<br /> I1 Hamblin Road, Mashpee, MA. Site Improvements, Date: August 8, 2017,
<br /> Drawn by: JB, Checked by: MC, 1) 8/31117 —Added Catch Basin and Dry Wells
<br /> for Pool & Patio, by: MC, check by: MC, 2) 1/10118 ----Revise Pool, Revise Deck
<br /> & Porch, Add Hot Tub, by. JB, check by: MC, 3) 1/19/18 — Show Pool Below
<br /> Deck, by: JB, check: MC, 4) 2/1/18 — Add Offset Dimensions, by: JB, check by:
<br /> MC, 5) 3/19/18 --Added, Ret. Walls Around Hse, by: MC, check by: MC.
<br /> 3. Site Improvements Phan — Cape & Islands Engineering, for Jacques & Martha
<br /> Morin, I1 Hamblin Road, Mashpee, MA. August 8, 2017, Drawn by: JB Checked
<br /> by: MC. #I- 8/31/17 Added catch basin and dry wells for pool patio, 42— 1/10/18
<br /> Revise pool, Revise Deck & Porch, Add Hot Tub, #3 — 1/19/18 Show Pool Below
<br /> Deck,44—2/1/18 Add Offset Dimensions,#5 —3/19/18 Added Ret. Walls Around
<br /> Hse,&Upgraded Septic System,#6---5/16/18 Relocate Proposed Dwelling. Signed
<br /> by: Matthew Costa No. 52282, Professional Land Surveyor. Sheet 4 of 6.
<br /> 4. House Plans: - JB Designs, for Morin Residence, Custom Four Bedroom Home,
<br /> Date: 3122/18, Drawn by: JB, Page 1 of 8 Scale: '/4" = 1'-0". Left Elevation, Front
<br /> Elevation, Rear Elevation, Right Elevation, Page 2 of 8: Foundation Plan, First
<br /> Floor Plan, Page 3 of 8: Second Floor Plan and Roof Deck.
<br /> Mr. Bonvie made specific reference to removal of the widow's walk to be removed
<br /> from the house plans which were read into the record, and do not exist.
<br /> 5
<br />
|