Laserfiche WebLink
MASHPEE SCHOOL COMMITTEE - REGULAR MEETI T - JANUARY 7. 1998 PAGE <br /> Falmouth High School, 151 for a total of 1,971. cape cod 'Tech <br /> currently shoves 58 Mashpee students. <br /> 7.8 Facilities Report - School Facilities Supervisor Doxy cook <br /> updated the committee on the following school facilities <br /> custodial maintenance issues; <br /> Coombs School: <br /> Maintenance: <br /> 0 New rubber stage steps installed <br /> a water system back flow preventers, serviced <br /> Elevator maintenance, year end <br /> Replacement of four exterior rooftop Hyl units to be included as or, { <br /> part of design work bid. <br /> r <br /> Custodial: <br /> Clean and add wax to wear areas on floors and clean items as <br /> requested by faculty <br /> Ouashnet Sc too s: <br /> Maintenance: <br /> } Fater system back flow preventers serviced <br /> Floor- tiles replaced in cafeteria as needed <br /> Vinyl wall base replaced in cafeteria as needed <br /> Custodial: <br /> • outside windows washed <br /> Cafeteria, kitchen, back hall and faculty dining room completely <br /> stripped, cleared and refinished during the December break <br /> fft <br /> :g School: <br /> Maintenance.- <br /> * <br /> aintenance.* Hot water.system problems to be corrected during school break <br /> Vinyl wall base installed in hallways where VCT flooring ars <br /> concrete blocks meet <br /> e Additional clocks added to the kitchen and cafeteria <br /> 0 Wheelchair lift installed in auditorium control room <br /> 9 Acid neutralizing tank improvements started <br /> 7.9 FY9 udgeet�l view - Mrs. cook asked if there were any <br /> areas of concern. Dr. DeMoura stated that 2% of the budget has <br /> been expended and there should be a savings in energy due to the <br />