1.10. PERMITS <br /> . THE CONTRACTOR AND/OR SUB-CONTRACTORS SHALL DEMONSTRATE TO MOTOROLA THAT ALL SYSTEMS AND SUB-SYSTEMS INSTALLED UNDER THIS CONTRACT, <br /> THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF OPERATE PROPERLY PRIOR TO THE FINAL ACCEPTANCE INSPECTION. PROVIDE THE OPERATIONS AND MAINTENANCE MANUALS AT THIS TIME. <br /> ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, AND LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE <br /> PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS WHICH MAY BE 1.16. SHOP DRAWINGS/AS-BUILT DRAWINGS <br /> REQUIRED FOR THE WORK BY THE STATE, COUNTY OR LOCAL GOVERNMENT AUTHORITY. THE WORK PERFORMED ON THE PROJECT AND THE THE MODIFICATIONS TO THE DRAWINGS AFTER CONSTRUCTION START SHALL RECEIVE ENGINEERING & MOTOROLA APPROVAL PRIOR TO ANY CHANGES BEING MADE. <br /> MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES. THE CONTRACTOR THE ENGINEER OF RECORD SHALL MAKE THE REQUIRED CHANGE AND WILL SUBMIT CHANGES TO MOTOROLA AND ANY JURISDICTION HAVING AUTHORITY. <br /> SHALL MEET ALL OF THE REGULATORY REQUIREMENTS OF THE JURISDICTION GOVERNING CONSTRUCTION. <br /> THE CONTRACTOR SHALL KEEP UP-TO-DATE MARKED-UP PRINTS OF THE PROJECT DRAWINGS. UPON COMPLETION OF WORK AT THE SITE, THE CONTRACTOR <br /> 1.11. SITE INSPECTION BY MOTOROLA SHALL REVIEW THE COMPLETED AS-BUILT DRAWINGS, AND ASCERTAIN THAT ALL DATA FURNISHED ON THE DRAWINGS IS ACCURATE AND TRULY REPRESENTS THE <br /> THE CONTRACTOR SHALL HAVE THE RESPONSIBILITY FOR ARRANGING WITH MOTOROLA FOR AN INSPECTION PRIOR TO COVERING UP ALL WORK AS ACTUALLY INSTALLED. MARKINGS INDICATING CHANGES TO THE DRAWINGS SHALL BE RED OR GREEN AND CLEARLY VISIBLE. TWO (2) SETS OF <br /> WORK THAT WILL BE COVERED IN FINISHED CONDITION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MANAGE THE SEQUENCE OF WORK "AS-BUILT" DRAWINGS SHALL BE FURNISHED TO THE MOTOROLA REPRESENTATIVE AT THE COMPLETION OF THE PROJECT. THESE DRAWINGS SHALL ALSO SHOW THE <br /> AND REQUEST THE INSPECTIONS IN A TIMELY MANNER. THE CONTRACTOR SHALL NOT REQUEST AN INSPECTION UNLESS ALL OF THE FOLLOWING: <br /> RELATED WORK HAS BEEN COMPLETED. WORK SHALL NOT PROCEED TO THE NEXT STEP UNTIL THE PREVIOUS STEP HAS BEEN INSPECTED * MODIFICATIONS TO SITE LAYOUT. <br /> AND APPROVED BY THE LOCAL INSPECTORS AND THE MOTOROLA REPRESENTATIVE. THE PRESENCE OF THE OWNER OR MOTOROLA <br /> REPRESENTATIVE ON THE JOB SITE IN NO WAY RELIEVES THE CONTRACTOR OF THE ASSOCIATED RESPONSIBILITIES OF THE JOB. ANY * GROUNDING SYSTEM LAYOUT. <br /> WORK WHICH DOES NOT MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS WILL BE CORRECTED OR REMOVED SOLELY AT THE * UNDERGROUND FUEL LINE RUN. <br /> • UNDERGROUND TELCO CABLE RUN. <br /> ' CONTRACTOR'S EXPENSE. * UNDERGROUND ELECTRICAL RUN. <br /> THE FOLLOWING INFORMATION IS INCLUDED AS A GUIDE TO THE CONTRACTOR TO ASSIST IN DETERMINING THE TYPE AND FREQUENCY OF WHERE THE CONTRACTOR IS RESPONSIBLE FOR SUPPLYING THE SITE EQUIPMENT (SHELTER, ISOLATION TRANSFORMER, GENERATOR, ETC.) THAT REQUIRES PERIODIC <br /> INSPECTIONS. THE LISTED INSPECTIONS REPRESENT THOSE REQUIRED FOR SMALL OR SIMPLE PROJECTS. LARGE OR COMPLEX PROJECTS MAINTENANCE, THE CONTRACTOR SHALL INCLUDE ALL OPERATION AND MAINTENANCE MANUALS AND ALL AS-BUILT DRAWINGS WHICH FULLY DESCRIBE THE ACTUAL <br /> MAY REQUIRE ADDITIONAL INSPECTIONS DEPENDING ON THE SEQUENCE OF WORK. INSTALLED EQUIPMENT. <br /> * FOUNDATIONS EXCAVATION AND REBAR: TO BE MADE AFTER TRENCHES ARE EXCAVATED AND FORMS ERECTED, REINFORCEMENT PLACED, 1,17 TEST PROCEDURES AND RESULTS <br /> COMPACTION TESTED, SOIL TREATED, VAPOR BARRIER PLACED, AND ESSENTIALLY READY FOR CONCRETE PLACEMENT <br /> * GROUNDING: TO BE MADE AFTER THE BELOW GROUND CADWELD CONNECTIONS HAVE BEEN COMPLETED, PRIOR TO COVERING UP THE THE CONTRACTOR IS REQUIRED TO SUBMIT THE RESULTS OF ALL TESTS REQUIRED BY THE PROJECT SPECIFICATIONS AND DRAWINGS THAT FALL WITHIN HIS SCOPE <br /> TRENCHES OF WORK TO THE ENGINEER OF RECORD W COPIES TO MOTOROLA WITHIN FIVE (5) DAYS OF THE TEST. THE CONTRACTOR IS REQUIRED TO SUBMIT TEST <br /> * ELECTRICAL WORK WITHIN WALLS: TO BE MADE AFTER THE ROOF, FRAMING, FIREBLOCKING AND BRACING IS IN PLACE PRIOR TO THE <br /> INSTALLATION OF INSULATION OR WALL/CEILING MEMBRANES. PROCEDURES NINETY (90) DAYS PRIOR TO THE TESTS BEING CONDUCTED. IN GENERAL, THE CONTRACTOR SHALL SUBMIT THE FOLLOWING TEST RESULTS: <br /> AS A GENERAL RULE, THE CONTRACTOR SHALL PROVIDE ADVANCE NOTICE TO MOTOROLA FOR INSPECTION OF ALL WORK PRIOR TO * MIX DESIGN/CONCRETE COMPRESSION TEST FOR ALL CONCRETE WORK. <br /> CONCEALMENT. THE CONTRACTOR HAS RESPONSIBILITIES RELATIVE TO ALL TYPES OF INSPECTIONS AND IS RESPONSIBLE FOR CONTACTING * TIME DOMAIN REFLECTOMETER (TDR) / SWEEP TEST FOR ANTENNA AND TRANSMISSION LINE <br /> ALL OF THE INSPECTING ENTITIES TO DETERMINE HIS RESPONSIBILITIES. ALL OF THESE INSPECTING ENTITIES HAVE UNIQUE AND SEPARATE INSTALLATION WORK. <br /> RESPONSIBILITIES. ONE INSPECTION FROM AN ENTITY WILL NOT SUBSTITUTE FOR AN INSPECTION FROM ANOTHER ENTITY. CONTRACTOR IS * FUEL LINE LEAKAGE TEST FOR FUEL TANK AND PIPING INSTALLATION WORK. <br /> RESPONSIBLE FOR ALL SCHEDULING & COORDINATION OF ALL INSPECTIONS REQUIRED BY CODE/PERMIT. * SLUMP TEST FOR CONCRETE WORK. <br /> * GROUNDING RESISTANCE TEST FOR GROUNDING WORK. <br /> 1 12 SAFETY * STRUCTURAL STEEL FABRICATION DRAWINGS <br /> • ANY OTHER TEST THAT MAY BE REQUIRED. <br /> THE CONTRACTOR, HIS EMPLOYEES, ANY SUB-CONTRACTORS, VENDORS, THEIR RESPECTIVE EMPLOYEES AND CONTRACTOR'S VISITORS SHALL <br /> COMPLY WITH ALL SAFETY STANDARDS, ACCIDENT PREVENTION REGULATIONSANDENVIRONMENTAL REGULATIONS PROMULGATED BY FEDERAL, 1.15. CONTRACT CLOSEOUT-IN ACCORDANCE WITH MOTOROLA'S SUBCONTRACT AGREEMENT TERMS AND CONDITIONS <br /> STATE OR LOCAL AUTHORITIES HAVING JURISDICTION AND SHALL AT ALL TIMES CONDUCT ALL OPERATIONS UNDER THE CONTRACT IN A <br /> MANNER TO AVOID THE RISK OF BODILY HARM TO ANY PERSONS AND THE RISK OF DAMAGE TO ANY PROPERTY, EQUIPMENT OR MATERIAL. THE MOTOROLA REPRESENTATIVE WILL PROVIDE A CERTIFICATE OF COMPLETION AND APPROVE FINAL PAYMENT WHEN ALL PUNCH-LIST RENTS HAVE BEEN CORRECTED <br /> SUCH PARTIES SHALL ALSO COMPLY WITH ANY SAFETY PROGRAMS AND/OR RULES PROMULGATED BY OWNER AND/OR MOTOROLA. AND ALL SYSTEMS ARE ACCEPTABLE. AFTER FINAL PAYMENT, CONTRACTOR WILL SIGN A RELEASE OF LIEN, <br /> 1.13. ELECTRO MAGNETIC EMISSIONS 1.19, WARRANTY <br /> THE CONTRACTOR SHALL ACKNOWLEDGE ALL OR PORTIONS OF THE WORK MAY INVOLVE POSSIBLE EXPOSURE OF CONTRACTOR, ALL WORK PERFORMED BY THE CONTRACTOR IN COMPLETING THE SCOPE IDENTIFIED ON THE DRAWINGS SHALL BE GUARANTEED BY THE CONTRACTOR FOR A PERIO <br /> SUB-CONTRACTORS, AND THEIR RESPECTIVE EMPLOYEES, AGENTS, INVITEES, LICENSEES AND OTHER VISITORS TO THE JOBSITE AND/OR OF ONE YEAR FROM THE DATE OF FINAL COMPLETION OF THE PROJECT. THIS GUARANTEE SHALL COVER ALL MATERIALS, EQUIPMENT OR WORKMANSHIP WHICH IN <br /> MOTOROLA PREMISES TO ELECTRO-MAGNETIC ENERGY 'EME" WHILE PERFORMING WORK UNDER THIS CONTRACT, ESPECIALLY IF WORK IS THE OPINION OF MOTOROLA E RENDERED DEFECTIVE CH G INFERIOR UI NOT IN ACCORDANCE WITGUARANTEE <br /> THE TERMS OF THE CONTRACT DURING THE GUARANTEE PERIOD. <br /> PERFORMED ON EXISTING ANTENNA TOWERS OR BUILDING TOPS WHERE ANTENNAS ARE LOCATED. THE CONTRACTOR REPRESENTS THAT IF, WITHIN THE GUARANTEE PERIOD, REPAIRS M CHANGES ARE REQUIRE, TO CORRECT THE GUARANTEE WORK, THEN UPON RECEIPT OF NOTICE, THE CONTRACTOR <br /> CONTRACTOR, SUBCONTRACTORS, AND ALL OF THEIR RESPECTIVE EMPLOYEES, AGENTS, INVITEES, LICENSEES, AND OTHER AUTHORIZED SHALL PROMPTLY AND WITHOUT EXPENSE TO MOTOROLA OR THE COUNTY, PROCEED TO: <br /> REPRESENTATIVES WHO ARE PERFORMING SERVICES UNDER THIS AGREEMENT WILL COMPLY WITH ALL ANSI AND ANY OTHER APPLICABLE * PLACE IN SATISFACTORY CONDITION ALL OF SUCH GUARANTEED WORK AND CORRECT ALL DEFECTS THEREIN. <br /> EME STANDARDS, RULES OR REGULATIONS, INCLUDING, BUT NOT LIMITED TO THOSE RULES OR REGULATIONS IMPOSED OR SUGGESTED BY - .MAKE.GOOD_ALL .DAMAGES TO._THE-STRUCTURE. OR SITE_OR.EQUIPMENT OR CONTENTS THEREOF, WHICH, IN THE OPINION OF THE MOTOROLA, ISTHE RESULT OF - <br /> MOTOROLA, IF ANY. ___ _ _-_. . _ .. ._ ..__ .__ _ .. _ __._. <br /> THE USE OF MATERIALS, EQUIPMENT, OR WORKMANSHIP WHICH ARE INFERIOR, DEFECTIVE, OR NOT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT; <br /> THE CONTRACTOR SHALL ADHERE TO ALL OSHA RULES, REGULATIONS AND ADOPTED POLICIES. ALL CONTRACTOR PERSONNEL SHALL HAVE * MAKE GOOD ANY WORK, MATERIALS OR EQUIPMENT, AND ADJACENT STRUCTURES DISTURBED IN FULFILLING THE GUARANTEE.. <br /> UNDERGONE ELECTROMAGNETIC ENERGY (EME) TRAINING FOR PERSONNEL WORKING IN THE VICINITY OF ACTIVE ANTENNAS. AS SUCH IT IS 1.20. RELATED DOCUMENTS <br /> RECOMMENDED THAT RF MONITORS BE USED BY THE TOWER PERSONNEL TO MONITOR EXPOSURE LEVELS. IF EME LEVELS AT THE SITE <br /> EXCEED THE MAXIMUM PERMISSIBLE EXPOSURE LIMITS, THE CONTRACTOR SHALL COORDINATE WITH THE INDIVIDUALS RESPONSIBLE FOR USE CONTRACTOR SHALL BECOME FAMILIAR WITH THE INFORMATION AND REQUIREMENTS CONTAINED IN THE FOLLOWING DOCUMENTS RELATED TO THE PROJECT: <br /> OF THE TRANSMITTER TO MAKE SURE THAT THE EQUIPMENT IS DEACTIVATED BEFORE WORK CAN BE RESUMED, WITHOUT CAUSING A <br /> SERIOUS DISRUPTION OF THE SERVICE. A. TOWER AND TOWER FOUNDATION DRAWINGS BY THE TOWER MANUFACTURER. <br /> 1.14. SITE CLEANUP B. R-56 STANDARDS AND GUIDELINES FOR COMMUNICATIONS SITES BY MOTOROLA. <br /> THE CONTRACTOR SHALL KEEP THE GENERAL WORK AREA CLEAN AND HAZARD FREE DURING CONSTRUCTION AND DISPOSE OF ALL DIRT, C. ALL OTHER PERTINENT DOCUMENTS LEGEND <br /> DEBRIS, VEGETATION, AND RUBBISH, AND REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY. WHENEVER THE PROPOSED <br /> WORK-SITE IS LEFT UNATTENDED, THE CONTRACTOR SHALL BLOCK THE OPENING WITH WARNING TAPE TO DISCOURAGE TRESPASSING. THE EXISTING <br /> PREMISES SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM PAINT SPOTS, DUST, OR SMUDGES OF ANY NATURE AT THE CONCLUSION p UTILITY POLE Q <br /> OF SITE WORK. <br /> C.J TREE VARIES <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR LANDSCAPE GRADING AND SEEDING OF THE DISTURBED SOIL. THE CONTRACTOR SHALL <br /> USE LOCAL GRASS SEED TO STABILIZE SOIL AND SHALL COVER DISTURBED AREAS WITH HAY MULCH TO REDUCE RUNOFF OF SEDIMENT TO f! UTILITY POLE GUY WIRE !i <br /> DOWNSTREAM AREAS. THE CONTRACTOR SHALL RESTORE THE SITE TO ITS ORIGINAL CONDITION. ALL SLOPES AND DISTURBED AREAS NOT —v— FENCE LINE —�— <br /> RECEIVING AGGREGATE SURFACING ARE TO BE PREPARED AND BROADCAST SEEDED AND FERTILIZED FOR EROSION PROTECTION. SEEDING <br /> FOR AREAS DISTURBED SHALL BE ESTABLISHED SEASONALLY AS REQUIRED BY LOCAL CODES. SILT FENCE - -�—%- <br /> THE CONTRACTOR SHALL EXERCISE ALL CARE TO AVOID DAMAGE OR INTERRUPTION OF EXISTING UNDERGROUND OR OVERHEAD ELECTRICS BUILDING LINE RRICCS[t <br /> SERVICES, UNDERGROUND GROUNDING AND FUEL LINES, EQUIPMENT AND BUILDINGS ON THE SITE, PLUS OFF SITE SERVICES, BURIED OR <br /> OVERHEAD, SURROUNDING THE EXISTING OR EXPANDED COMPOUND, ANY PROPERTY DAMAGE CAUSED BY THE CONTRACTOR OR HIS GROUNDING LINE �'-•-b'-'•--® <br /> OPERATIONS SHALL BE CORRECTED AND/OR RESTORED TO THE SATISFACTION OF THE PROPERTY OWNER(S) AND MOTOROLA AT NO GROUND ROD <br /> ADDITIONAL COST TO THE PROPERTY OWNER OR MOTOROLA. <br /> _ NUMBER IN,�ICATES ".gCTION" LETTER ----E---- UNDERGROUND ELEC. LINE -----E---- <br /> . <br /> WILL NOT BE PERMITED. INDICATED ELEVATION OR DETAIL - __ <br /> SHEET NUMBER WHERE SECTION, _T UNDERGROUND TELE. LINE ---T---- <br /> ELEVATION OR DETAIL IS DRAWN ---GFS--- UNDERGROUND GAS LINE -GAS-- <br /> i n f i n I g v GENERAL NOTES AND LEGEND <br /> en gin DelingC2 <br /> auen <br /> & rvyig MOTOROLA MASHPEE <br /> xw <br /> Bub 1A1 <br /> 154 INDUSTRIAL ODRIVEn IS A NDUnON Of UW FOR ANY PERSON. <br /> O =ZONIM ISSUED FORNGB RCB GPk FnS.J.«I ,'Ig'�g �' 8$'S17 Lu'+`3P'J.3� * ti. REV VNLESS THEY ME AC11NL VNDEfl THE DIflECPON <br /> 127-403 MASHPEE, MA 02649 O OF A LICENSED PROFESSION&ERO FER,TO&TER <br /> ND. eY Gra As>' Tws DDcuRENT. <br />