Laserfiche WebLink
6 <br /> mK :........... <br /> building is considered a commercial 1 2ompb grind <br /> building, the windows will need to be rated requirements see RW <br /> for 120 mph, Sullivan report <br /> It was agreed that the design team wi I I A4.00 Exterior Elevations <br /> submit revised elevations& site drawings RI B ICA Civil Drawing Package closed <br /> for the committee's review. � <br /> The Town noted that National Heritage <br /> should be consulted to confirm that RB Open <br /> endangered species will not be affected by <br /> the construction of the building. <br /> The Town required that a 20tn scale site <br /> plan be submitted to the Fire Department so CA Provided Closed <br /> that equipment swing overlays can be done, <br /> Aprons between the <br /> The Town requested a bile path narrative on hoer roadway and bike path <br /> 16. the path will be maintained during construction and CA are to be install at the Closed <br /> how the street will be Dept clean during construction. start of construction as <br /> noted on sheet -4 <br /> Specific information is <br /> The Town requested s site plan clearly indicating shorn on Sheet C-3 and <br /> 16. existing trailers and how the trailers will be CA c-4 as to location and Closed <br /> addressed on the site and after construction when the trailers will be <br /> removed. <br />