Laserfiche WebLink
f <br /> Sheet -4 <br /> rt The Town requested that the design team resubmit A 20-scale landscape closed <br /> the landscape plan at a bigger scale. plan has been submitted <br /> J R has reviewed and <br /> 8. septic system will need to be certified by J R? CA can certify the septic closed <br /> desi n Ian as required. <br /> 0 Need to do septic calculation to confirm septic design/flows have <br /> leach capacity. Design team to provide CA been coordinated and closed <br /> calculation. leach capacity confirmed <br /> Entrance curb cut permit <br /> 9. Entrance curb cut permits will be required. CA will be obtained d u ri n g Record <br /> b u i Id i n errs it phase. <br /> Sight distance lines and <br /> required design distance <br /> 10. Sight distance calculation at site entrances will be CA are shown on C-4. Areas closed <br /> required. to remain clear for sight <br /> distance has also been <br /> shown on -4 <br /> The Townindicated that protection of the eistin Erosion control has been <br /> shown in roadway catch <br /> 11. storm water structures during construction will be A closed <br /> required. Basins and will be part of <br /> the construction SWPPP <br /> Erosion and settlement control application will be The E&s permit will be <br /> 12. required. CA obtained during the Record <br /> building,permit phase <br /> 13. Provide recycling bins at the main trash location. CA Note added for recycling closed <br /> Y at d u m ster area <br /> 14* Building comments <br /> 0 Height issue exceeds 357.011 RKB/RG variance en <br /> B p <br /> A4.00 Exterior Elevations <br /> a Rooftop units need to be screened RIB &A1.06 Overall Roof closed <br /> Flan <br /> 0 sound levels for rooftop equipment have <br /> been requested by the town Handout provided for <br /> a Potential sound study may be required R B each unit in question closed <br /> depending on the direction of the sound RTU 1 P RTU2) & RTU 8 <br /> discharge. <br /> Provide cut sheets& samples of products <br /> (pictures) of the proposed stone, cedar R B Samples to be brought to Closed <br /> shingle, and colored membrane roofing presentation <br /> with ri b <br /> Roof Line details are to <br /> Look at changing roof line details (Need to RIB remain, address elevation Closed <br /> confirm with Town) <br /> concerns <br /> The Town does not favor stucco and was <br /> very concerned with the loop of the north North Elevation has been <br /> elevation (gym wall). It was requested that Rf B revised See A4.00 dosed <br /> the design team revisit the north elevation Exterior Elevations <br /> and make it more consistent with the look of <br /> the rest of the building, Elevation site lines <br /> Building Has been <br /> The Town reported that because the RIB designed to meet the dosed <br />