My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/7/2012 DESIGN REVIEW COMMITTEE Minutes
>
8/7/2012 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 12:24:44 PM
Creation date
7/9/2018 3:25:58 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/07/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Wampanoag Affordable Housing <br /> 183 Meetinghouse Road <br /> Plan Review <br /> Page two <br /> Sheet 3 of 12 <br /> 1. Comment accepted. <br /> 2. Comment accepted. <br /> 3. Comment accepted. <br /> Sheet 8 of 12 <br /> 1. Comment accepted. <br /> 2. Comment accepted. <br /> Sheet 9 of 12 <br /> 1. Hydrant relocation is noted. The location of all hydrants should be confirmed with <br /> Mashpee Fire/Rescue and may depend on the preferred operating procedure for <br /> their first due engine company. <br /> Sheet 10 of 12 <br /> 1. Comment accepted. <br /> 2. Comment accepted. <br /> 3. The stormwater management plan needs to be a part of the construction <br /> documents. The minimum criteria for the contractor to follow should be spelled out <br /> in detail. If a long term pollution prevention plan is to be prepared subsequent to <br /> the approval of the documents under current consideration, a time to submit the <br /> plan should be agreed to with a date certain for review. <br /> Sheet 11 of 12 <br /> 1. Comment accepted <br /> 2. A sidewalk has been shown on one side of the entrance road. Consideration <br /> should be given to providing additional sidewalks within the project perimeter <br /> perhaps with a phasing of the work to coincide with a particular number of dwelling <br /> units having been completed. <br /> 3. The cement concrete ring should extend to include sealing the riser to the casting <br /> and the LeBaron grease trap eliminated with the use of ADS pipe. <br /> 4. Comment accepted. <br /> 5. Comment accepted. <br /> 6. Same comment as Item 3 above. <br /> Sheet 12 of 12 <br /> 1. Comment accepted. <br /> 2. Comment accepted. <br /> Bureau of Indian Affairs Plan <br /> Comments 1-5 as noted in my letter of July 25 have been addressed satisfactorily. <br /> General Comment: No additional information has been received for the individual houses <br /> to see if any adjustments were made in their location. <br /> Please feel free to contact me if you have any questions. <br /> V rZowle <br /> urs. <br /> Charley,gPE, Pl- <br /> Bracken EngineePLring, <br /> Mr. Jay Briggs <br />
The URL can be used to link to this page
Your browser does not support the video tag.