My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/18/2012 DESIGN REVIEW COMMITTEE Minutes
>
9/18/2012 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 5:01:40 PM
Creation date
7/9/2018 3:26:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a hpee Design Review Committee <br /> Minutes of Meeting Heid Tuesday, September 18, 201 <br /> iaa pee Town Hall Meeting Room I <br /> Committee Members Present: Walter Yarosh, Jonathan Furbush, and Mary <br /> LeBlanc. <br /> Absent: David l ooharian., <br /> Plan Review Members Present: <br /> Joyce Mason, Torn Manager <br /> Charlie Maintani T Building Department <br /> Joel Clifford, Fire Inspector <br /> Glen Harrington, Health Agent <br /> Catherine Laurent, DPW Director <br /> Scott Carline, Pdlioe Department <br /> Walter Yarosh called the meeting to order at 8:35 a.m. <br /> Reo r a i e De g i n Review oardi of SelegiMen — Polio o. <br /> Mary Le Blanc and Jonathan Furbu h felt strongly that Walter Yaro h should <br /> again serve as Chairman of the Design Review Committee. <br /> Motion* Jonathan Forbush motioned to keep Walter Yarosh as Chairman of <br /> Design Review Committee; Mary ry LeBlano seconded the motion- and the motion <br /> was passed with Walter Yaro h abstaining from the vote. <br /> 548 Falmouth Road <br /> Alliance Energy LLC, Jamie Cook <br /> Land cape Review <br /> Jamie Cook and Rui Felix appeared. Walter Yarosh noted that the work i <br /> completely finished and then applicant came to get approval. Mr. Cook said they <br /> bought the station from Ex onMobil about 2 years ago. He said in 1996 evidently <br /> the original approval was made with conditions. He said they sent a letter to <br /> complete work and then get approval. Mary LeBlanc noted that plants were all <br /> there on-site% it was done in very hot Breather on a weekend; and if they didn't get <br /> everything in the ground they would lose everything. Walter said he <br /> understands but doing approval afterwards puts this Board in an awkward <br /> position. <br />
The URL can be used to link to this page
Your browser does not support the video tag.