My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/02/2000 BOARD OF HEALTH Minutes
>
03/02/2000 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 5:06:41 PM
Creation date
7/13/2018 2:20:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
03/02/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES March 2, 2000 2 BOARD OF HEALTH <br /> Mr. cram motioned to grant the variances as outlined in a cover letter from J.E. <br /> Landers-cauley, P.W. dated March 2, 2000 with the stipulation that revised plans are <br /> submitted to show ars additional 4'from the leaching to the edge of wetlands in order <br /> to achieve 75'from wetlands. Once these plans are submitted, Mr. cram motioned for <br /> Mr. McQuaid to review and approve therm. Mr. Doherty seconded'the motions. <br /> Motions passed. <br /> 5. Proposal from green deal Environmental_re , n91pering Beres <br /> Board acknowledged and will review further. R <br /> 6. Variance request; 202 Daniel's Island loaf <br /> Applicant is requesting a variance of ' fr m. the proposed soil absorption <br /> system and the reserve area to the street property line. <br /> Mr. Doherty motioned to grant the variance as outlined in a cover letter from <br /> Cape Islands Engineering dated February 29, 2000. Mr. cram seconded the <br /> motion. Motion passed. <br /> APPOINTMENT: Mr. Binh Phu re: 25 Nobska Road <br /> Mr. Phu was in attendance for-this scheduled appointment. • <br /> Mr. Phu supplied the Board with ars outline of circumstances surrounding the <br /> purchase of a piece of lard and subsequent attempts to build the house through an <br /> apparently difficult contractor. The septic permit that had been issued in January of <br /> 1997 has expired. Mr. Phu is requesting a 30-day extension on the septic permit to <br /> be re-issued to a neer insta er) due to hardship. Mr. Phu indicated that he is now <br /> ready to proceed with the septic installation and can have theinstaller begin within <br /> the next week. <br /> Mr. cram motioned to grant a 30-day hardship extension to the septic permit for 2 <br /> Nol sl a Road. Mr. Doherty seconded the motion. Motion passed. <br /> 7. Emergenc Failure certification: 839 cotuit Toad <br /> Ms. Warden noted that sewage was overflowing onto the ground surface. The <br /> installation of two500-gallon drywells is necessary. <br /> Board members forwarded their signatures to the Emergency Failure <br /> Certification Form. <br /> . Previous variance a royal for reconsideration - 156 Water �a <br /> •- Mr. McQuaid stated, "It was brought to my attention recently that lack in <br /> March of 1998 the system was approved by the Board of Health for a 4 bedroom <br /> house on a lot with 18,975 square feet that is in the Zone Il area. It was not <br /> brought to anyone's attention in that this was in conflict with Title V. No <br /> permit has been issued;just approved. The Board has a choice to either accept <br /> this as something that fell through the crack or allow a 3-bedroom house on <br /> this lot since it was submitted before the end of last year. If it were submitted <br /> now, it would only be allowed two bedrooms. My recommendation n would be t <br />
The URL can be used to link to this page
Your browser does not support the video tag.