Laserfiche WebLink
AITNUTES April 7, 1997 7 BOARD OF]HEALTH <br /> Mr. DiMaggio commented, "There are places where there are cuts we did that <br /> re more than 4'." "These things were no mentioned in the contract." "Things have <br /> changed. <br /> Mr. Scipi ne stated, `The best thing for 1W. DiMaggio to do is execute a change <br /> order before you do the work for things you know are going to happen." "It is definitely <br /> in the towns best interest to have the contract operator shape the site up for closure and <br /> get ready to close." "It will save an awful lot of money for the closure costs and the <br /> money is well spent.' <br /> 13. Full trailers not transrted tiMSIlyto Otis as per contract <br /> Board members agreed this is an in-house matter. <br /> 14. le 111 1-7 #3 <br /> Mr. Scipine stated, "This is for the intermediate material." "That is not an issue <br /> any more because it does not have to be tested." "It is now based on soil classifications." <br /> 15. Pae 111 71.8 #3.04A - Not being done (no continuous attendant and #3 04.E - <br /> ard of Health has been payiqg for si <br /> Mr. DiMaggio relayed, "You can't have a man cleaning up and watching at the <br /> same time." <br /> Mr. Scipi ne stated, "The only think you can do is have an additional person at <br /> the site." "I Will speak with Elias on the cover material." <br /> (Signs) Mr. Cram stated, "It states that the contractor must post the signs it does <br /> not state he must provide or maintain them." <br /> Mr. S ipi ne c n .e ted, "He has to make sure he posts then." <br /> 16. Do we meed to pa.v for the leaftree it c m ting 111 71-1 307 A <br /> Mr. DiMaggio stated, "If you incorporate that in the contract it will probably be <br /> approximately$10,000.00 a ear." <br />