Laserfiche WebLink
4 <br /> NHNUTES September 4, 1997 4 BOARD OF HEALTH <br /> w <br /> 9 Gleneagle Drive - 11r. McQuaid relayed, `I inspected the site and found the leach pit <br /> full." <br />' Board members forwarded their° signature's to the "Emergency repair <br /> Certification"form. <br /> 4 Helmsman Place - 1&. Irk McQuaid relayed, "I inspected the site single 1 <br /> � p to and found g1 each <br /> pit showing signs of overflow." "It will be replaced with a new Title V system," <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> Emergency Failure Certification- 12 Mayflower Road <br /> Mr. McQuaid relayed, "I inspected the site and found the leach pit full." <br /> Board members forwarded their signature's to the �`En�er� en Repair <br /> Certification" form. <br /> i <br /> EMprgena Failure Certification- 184 Gl nea le Drive <br /> Mr. McQuaid relayed, "I inspected the site and found the leach pit and tank full," <br /> "A d-box and second pit will be installed." <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> Variance request- 111 Meadowbrook load <br /> Mr. McQuaid relayed, `This is a pre-approved subdivision." "The applicant is <br /> requesting a 2' local variance from the proposed on-site leaching facility to abutting well <br /> (#105 1leadowbrook Road) and a ' local variance from the proposed on-site leaching <br /> facility to the proposed on-site well," <br /> Mr. Cram motioned to grant the variances as stated by Mr. McQuaid, Mr. Doherty <br /> seconded, all agreed, <br />