Laserfiche WebLink
NflNUTES November 2 , 1997 3 BOARD OF BEALTH <br /> Mr. Cram motioned to grant the variances as stated by Mr. McQuaid, Mr. Ball <br /> seconded. <br /> Emergency Failure Certifications <br /> 1 Great River Road- - Mr. Evans relayed, "I inspected the site and found the septic <br /> system to consist of one 275 gallon old fuel oil tank with it's overflow going directly into <br /> the Great River." "Engineering plans will be required." "The owner would like to install <br /> a tight tank because there is no room for anything." <br /> Mr. McQuaid commented, "That will require D.E.P. approval." "If the Board <br /> declares the system in failure it will help expedite I .E.P. approval of the tight tank." <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form.. <br /> 46 Dry Hollow Dane - Mr. McQuaid relayed, "I inspected the site and found the leach <br /> pit full." <br /> Board members ers forwarded their signature's to the `Emergency Repair <br /> Certification" form. <br /> 20 Linden Avenue - lir. Evans relayed, "I inspected the site -and found the leach pit <br /> full!9 <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> *****OLD BUSINESS***** <br /> Proposed Septic... stem Ins a tion Poligy <br /> 1 Ir. Cram motioned to adopt the policy as prepared by Mr. McQuaid,..Mr.r. Ball <br /> seconded. (The policy is attached to the enol of these minutes.) <br />