Laserfiche WebLink
NMN-UTES December 1 , 1997 2 BOARD OF HEALTH <br /> Mr. McQuaid relayed, "The Board could adopt a policy saying that if for some <br /> reason, not on the part of the health agent, we have to wait for more thea a half hour then <br /> we charge the engineer the pert fee and have them reschedule the perc.pertest." <br /> Mr. Evans stated, "I would recommend we check with other health agents." <br /> Mr. McQuaid stated, "Another alternative is adopting a policy that if the <br /> excavator is not there within one half hour reschedule." <br /> Mr. Doherty motioned to adopt a policy whereby health agents' shall not be kept <br /> waiting for percolation tests for more than 15 minutes per scheduled appointment or a fee <br /> f$75.00.will be charged and the engineer will be required to reschedule the prc test at a <br /> later date, Mr. Tall seconded, all agreed. <br /> . Emergency failure certifications', 78 Troon Way and 22 Cambridge Drive <br /> i <br /> 78 Troon W - Mr. McQuaid relayed, "l inspected the site and found the cesspool � <br /> over owing. <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> 22 Cambridge Drive - Mr. McQuaid relayed, "I inspected the site and found the liquid <br /> level in the d-box above the outlet pipe." "The d-box and pitwill be replaced." <br /> Board members forwarded their signature' to the "Emergency Repair <br /> Certification form. <br /> Emergency pair Certification- 70 Pr hrn Point <br /> Mr. McQuaid relayed, "I inspected the site and found the leach pit fall.,' "The <br /> reserve will be installed as per plan. <br /> Board members forwarded their signature" to the "Emergency Repair <br /> Certification" form. <br />