My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/16/1996 BOARD OF HEALTH Minutes
>
5/16/1996 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 5:10:37 PM
Creation date
7/13/2018 2:45:34 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
05/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NflNUTES May 16, 1996 6 BOARD of HEALTH <br /> . Drat Groundwater Protection Brochure -w Board members agreed to request they <br /> print the Board of Health phone number on the brochure. <br /> . Copy of memo to Selectmen re: Human Services budzFet - Acknowledged. <br /> '. Fetter re: Sticker sales - 1r. Doherty volunteered to respond to the letter. <br /> . Proposed memo to Selectmen re: Quonset but permit fees - Board members <br /> agreed to request the Board of Selectmen t waive all fees associated with the instanation <br /> of the Quonset Hut. <br /> 9. Proposed memo to D.P.W. re: Back Road -- Acknowledged. <br /> 1 . Variance request., 10 Huron Avenue - Mr-. McQuaid relayed, "rhe owner is <br /> requesting a 48" local variance from the proposed on-site leaefacility to abutting well <br /> (#14 Huron Avenue) and a 24" local variance from the proposed on-site leaching facility <br /> to abutting well (#6 Huron Avenue)." <br /> Mr. Ball motioned to grant the variances as stated by Mr. McQuaid, Mr. Cram <br /> seconded, all agreed. <br /> 11.} Emergency failure certification 139 Great Neck Road North & Sugar Pine <br /> Circle <br /> 139 GREAT NECK ROAD NORTH - Mr. McQuaid relayed, "This is the first repair i <br /> the State under the Septic System Repair Grant Program." <br /> Board members forwarded their signatures to the "'Emergency Repair <br /> Certification" form. <br /> SUGAR PINE CIRCLE -- Mr. Evans relayed, "I inspected the system and found the <br /> pit overflowing onto the ground surface." - <br /> Board members forwarded heir signatures to the "Emergency Repair <br /> Certification" form. <br /> 12.) Invitation to the "99 Restaurant" - Acknowledged. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.