Laserfiche WebLink
NUNUTES September 5, 1996 8 BOARD of HEALTH <br /> 130 Shore Drive'guest <br /> Mr. McQuaid relayed, "At last weeks meeting the Board required the engineer to <br /> reperk the lot and to submit new plans.,' "`The lot was reperked however, new plans show <br /> the exact sane system which is not new Title v system."' "I would recon nen the <br /> Board require the engineer to modify the plans to conform to the new Title v <br /> requirements."' <br /> Mr. Doherty motioned to require the engineer to su rnit new plans which delineate <br /> a leaching facility which conforms to the new Title v requirements, Mr. Ball seconded, all <br /> agreed. <br /> Emergency Failure Certification - 40,l ineerest <br /> Mr. Evans relayed, "I inspected the site and found the leach pit fflled and <br /> overflowing. <br /> Board members forwarded their signatures to the "Emergency Repair <br /> Certification" form. <br /> Emerger cFailure Certification- 1 Main Street <br /> 1r. Evans relayed, I inspected the site and found the leach pit full. `The owner <br /> has been approved for the Septic System Repair Grant Program." <br /> Board members forwarded their signatures to the "'Emergency Repair <br /> Certification" form. <br /> i <br /> Beim no further business Mr. Doherty motioned to adjourn this meeting at 9:01 p.m., Mr, <br /> Ball.seconded, all agreed. <br /> Respectfully submitted, <br /> veronica layer, Adm. Asst. <br />