Laserfiche WebLink
i <br /> i <br /> i <br /> NffNUTES September 19 1996 4 BOARD OF HEALTH <br /> supposed to do a perc test." -,We did the perc test the day of the soil testing and that was <br /> witnessed by Orin," <br /> Mr. Cram stated, "It does say at least two pert tests should be performed." <br /> Ir. Sanicki stated, "I didn't personally do the perc test but I know we had water <br /> on the site.' "I assumed Orin had to tests done on-site." "'Soil conditions in both holes <br /> were similar." `"In both soil tests the profile were identical."' "I assume there were two <br /> pert tests done on the lot." "But even if there asn"t it's common sense to me that if the <br /> soils are the sane they're gomng to Pere the same." "'This particular soil perked less than <br /> two minutcs per inch." <br /> Mr. McQuaid stated, "Orin insists on two deep observation holes, he perks one." <br /> "If the soils are identical there is no need to perk both holes." "I doubt that is in Title v <br /> and I know we need two holes." <br /> Ir. Sanicki stated, "In reference to 15.104(7) I dont know why she put that in <br /> here I just don't understand this." "'You can't do a pert test after the hole has been open <br /> for three days." "Why she put that in there doesn't make sense to me." "Me soil test and <br /> the perc test is done the same day."' "'Some of this stuff'I don't understand why- it looks <br /> nice on paper as far as 17m concerned." 4`I going to pass that one because the pert test <br /> was done the saa.e day and the hole was done." "'15.107 that references hydro geolo gical <br /> properties and for other parts of the State they're looking for bedrock beneath the system <br /> so you have sufficient permeable material in the soil.,"' "We discussed this at the previous <br /> hearing, the soil maps by the Mate, the sensitive area by the river we can go deeper with <br /> backhoe - you open up a hole it falls in." "'We can go closer to the water and confirm." <br /> "If we hit bedrock in this location or in most of this town actually I would be totally <br /> flabbergasted it's confirmed it's all an out rash*7" "I would say in 90% of the town of <br /> Mashpee the soil hasn't any bedrock beneath it." "That's ghat she's eluding to i assume <br /> in that particular situation." "With reference to 15.212 depth to groundwater.3013 "At the <br /> previous hearing I understand her question, test hole #2 was done approximately at <br /> elevation 20 we did a 10' hole that puts me down to elevation 10." "The bottom of the <br /> septic system is 3.7" I'm going 1377 so I shoving 3.7' below the bottom of the test hole <br /> and die's alluding that I'm not telling the Board that there i ' of permeable material <br /> beneath this system."" � ecogni ing the soil maps, recognizing the elevations, recog min <br /> the elevation at the salt marsh, the top of the salt marsh is rmning between 2. ' and 3.2. <br /> and then I mentioned elevation ." "If the groundwater was elevation 6 it would be <br /> seeping out the sideall of this particular area." "6 to 13 gives you 7 almost 81 above <br /> groundwater."' "I know factually by observations that there is definitely more then 5' <br /> above groundwater for this particular septic system design." <br />