Laserfiche WebLink
NUNUTES December 12, 1996 BOARD of BEALTH <br /> they're response is no."' I know many people have called the Board of Health on many <br /> occas ions to complain about things." ""We have a copy ofthe Mss. dept. of Health <br /> regulations and we also have the Attorney General's guidelines for mobile home parks." <br /> "The representative from the Attorney General's office has told us that they are in <br /> violation of almost everything in there.' "Our number one concern is water quality and <br /> pressure."" "we get no notification when the water is going to be shut-off.303 "When they <br /> first bought the park there was a memo sent to everyone dated November 20, 1992 stating <br /> that between 10:00 and 12:00 every Wednesday the water would be shut-off for flushing.' <br /> "That hasn't been done for the last three ears." "They said it was going to happen until <br /> ffi � pp <br /> rther notice." "There was never a further notice and it said the water would be ofd'and <br /> people could plan for it. l' "The last three years there has been no set time for this to be <br /> done." "Sometimes it's done every few weeks, sometimes it's done every few months.55 <br /> "Nobody has any waning when the water is shut-off." "The way the previous owner's <br /> flushed the pipes we never had rustywater." "The water pressure is poor in some of the <br /> trailer's most of the time and poor in all of the trailer's some of the time." "The <br /> dumpster's are emptied once a week on Wednesday's." `The dumpster's are usually open <br /> and overflowing by Friday., "The area isnot properly graded so there are always puddles <br /> and mud." "During the week one of the managers will come with a bobcat and push the <br /> trash down trying to compact it but then you e .n"t open the side doors which des it <br /> very difficult for people to reach over the top. <br /> At this time Ms. Smith submitted photographs of the full d .mpster's. <br /> Ntr. Cram questioned Ms. Smith, `when were the pictures taken?" <br /> Ms. Smith responded, "Most of them were taken on the weekend, some were <br /> taken*ust before they empty them on Wednesday.'' <br /> Ms. Smith stated, `There are trees and limbs that need removing and are ready to <br /> fall on trailer's." I won't get into the electrical wiring because the electrical inspector has <br /> i already been out there.' "There was new cesspool installed in one place and there was a <br /> tree where the cess p l was g oin and the roots interfered." "About two this o the <br /> roots were removed so the tree is now standing there next to one of the trailers with only <br /> one third of the roots in it. ' <br /> Ms. Dohrt uestioned Is. �nith, `Do remember the date of the septic work' "' <br /> yq <br /> Ms. Smith responded, "I think it was in September or the beginning of October.> <br /> "we recently had to have our septic systems replaced." "They put <br />