My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/14/2017 WATERWAYS COMMISSION Minutes
>
2/14/2017 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 5:01:19 PM
Creation date
7/25/2018 2:08:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Harbormaster Report: Activities are slow on the water. Al spending time on <br /> administrative matters including management of 552 moorings. Payments <br /> for moorings due April 30, 2017. Al also spending familiarization/training <br /> time with Mashpee Police Department. <br /> Shellfish Constable Report: <br /> Request from Christine Willander to handle a clarification issue with Mr <br /> Ronhock. This needs to be verified with Al Turner and Rick York. <br /> Mr. Bates believes there needs to be a change in liability from the town to <br /> the individual for damage to shellfish activities/equipment by dredging <br /> operations as dredge pipe cannot be controlled to avoid damage to <br /> shellfish .areas located in close proximity to waterways. It .be the <br /> responsibility of the applicant to follow up with the Waterways Commission <br /> about Town dredging scheduled.on April 15t and October 1g' each year. Mr <br /> Bates will review this shift of liability with the Town. <br /> Committee Reports: <br /> ➢ Mashpee Lakes-Wakeby Lake & Johns Pond -nothing to report <br /> ➢ Popponesset Bay Area-nothing to report <br /> ➢ Waquoit Bay Area- nothing to report <br /> ➢ Water Quality Update/Water Sampling- Don MacDonald will publish <br /> in April dates for summer sampling schedule <br /> );;P. Barnstable County Coastal Resources Committee Update-nothing to <br /> report <br /> ➢ Sewer Committee Update-nothing to report <br /> ➢ Public Access Update- Al Wickel and Catherine Laurent are working <br /> on signage for ramp areas. <br /> ➢ Waterways improvement Plan & Dredging <br /> 1916 Channel dredge is complete <br /> - Approach channel dredge dates TBD (3110117) start is <br /> scheduled. <br /> NEW BUSINESS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.