Laserfiche WebLink
BOARD of SELECTMEN Page <br /> MINUTES <br /> MONDAY,D NU 1 1994 <br /> Discussion relative to Architect Selection: <br /> Mr, Politito and Mr. Griffin discussed references and <br /> relevant positive information pertaining to DRA with the Board . <br /> Committee member, Bill Marterios spoke in opposition of DRA. <br /> The Town should make an effort to submit architectural <br /> drawings with documents to the State by June 1, 1994 for <br /> reimbursement indicated Mr. Griffin, <br /> Mr. Griffin indicated that he does not feel the RFP design <br /> completion date of Jure 1 , 1994 is a contractual responsibility <br /> f the Town. The date allows for contractual ability of an <br /> architectural firm to be considered related Mr. Griffin, <br /> Selectman Jacobson recommended to obtain the support and <br /> funding initiatives from local legislative groups . <br /> Selectman Caffyn indicated that she reviewed several school <br /> sites including a Connecticut school designed by a different <br /> architectural firm. <br /> Selectman an Caf fyn recommended to further review the <br /> architectural selection process . Of the two selected <br /> architectural firms , e l ectman Caffyn indicated tha t she has not <br /> seen a building aesthetically pleasing. <br /> Selectman Costa recommended to obtain further information <br /> before a decision is rendered by the Board. <br /> *Mr. Griffin recommended to consult Town Counsel with <br /> regards to the selection process . The Board is in agreement . <br /> The architectural selection will be placed under advisement at <br /> this time. <br /> For the record, Selectman Mills indicated that some Board of <br /> Selectmen members were lobbied for a particular architectural <br /> firm. It is not appropriate for an architectural firm to lobby <br /> Board of Selectmen members for their support indicated Selectman <br /> Mills@ <br />