Laserfiche WebLink
• <br /> BOARD of SELECTMEN Page <br /> MINUTES <br /> MONDAY, JANUARY 31 1994 <br /> Discussion relative to Architect Selection: <br /> Mr. Dinizio recommended the Board consider the appointment <br /> of Michael Pare to the Jr/sr High School Building Committee. H <br /> is a technical manager at WHOI and has extensive experience in <br /> computers and technology related to education.' <br /> Of the ten architectural applicants , five firms were <br /> selected by the committee to interview indicated Mr. Dinizio. <br /> 'three finalists were selected for review. <br /> The committee voted unanimously to recommend to the Board of <br /> Selectmen, the firms of Drumme , Rosane and Anderson DRA and <br /> Keyes Associates for consideration. <br /> There is nothing to disqualify either firm indicated <br /> Mr. Dinizio. Both are excellent firms and will do a good job for <br /> the Town. Mr. Dinizio indicated that four members of the <br /> committee favored DHA while three members preferred Keyes <br /> Associates . <br /> The committee members investigated the architectural <br /> backgrounds of the selected firms noted Mr. Dinizio. site visits <br /> were also conducted . <br /> Committee member Bill Jones investigated the firm of Keyes <br /> Associates , This firm has integrated capability within one <br /> organization. Keyes , an architectural and engineering firm will <br /> allow opportunity for tight control in a difficult challenge <br /> indicated Mr. Jones . <br /> Mr, Greelish spoke in agreement with Mr. Jones . The <br /> combined in-house asset of Keyes Associates is their main <br /> strength. DRA has to bring in a n.uher of outside consultants <br /> noted Mr. Creelish, a member of the Jr sr High School Building <br /> Committee . <br /> Mr. Greelish indicated that the original Request for <br /> Proposal specified a deadline of June 1 , 1994 for completed <br /> architectural drawings . He recommended to obtain a ruling from <br /> Town Counsel to remove the timetable. This is too short of a <br /> timetable within the scope of the project to do the right job <br /> related Mr. Greelish. <br /> Committee members Paul Griffin and Joe Politio expressed <br /> support to DRA as the selected architectural firm. It is their <br /> commitment to Mashpee to retain the entire team of designers . <br />