My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/14/1993 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
9/14/1993 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:16:14 PM
Creation date
8/10/2018 11:52:19 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/14/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Mashpee High hoof Building Commi tt <br /> FROM: Joe Polito <br /> DATE : September 14 , 199 <br /> As discussed the RFP needs to be prepared by the Selectmen and <br /> Town Counsel . <br /> The Mashpee High hoof Building Committee will need to makes <br /> 4 <br /> it' s viewsand preferences known to the Selectmen ; at this point <br /> the are: <br /> ] a. Dr . De u r .} (skills/experience vli t) for scope of <br /> work, <br /> a. The free schedule obtained from DCPO etc . <br /> a. The designer selection guideline from D P . <br /> 4 , The architects work to date; site definition <br /> 5a. The appraisers work to date on land cost. <br /> The Committee needs tO PLIt together a reeds I i t of what results <br /> the building architect and the design proses need to provide for <br /> the development of the High School - the RFP may consist of some <br /> of the following: <br /> b . Review findings obtained b the Building Committee from <br /> educational on u l tan t program information supported b <br /> superintendent' s office, school committee the site <br /> feasIbIlity study architect' s report and any and all <br /> town and town authority -input. <br /> 2b. Meet with organizations and committees to synthesize <br /> p r g ram information . <br /> 3b. Develop design process with the Building Committee , <br /> Selectmen .n d Town Counsel . <br /> 4b. Provide detailed engineering on selected site a. s. a. p. <br /> if not sooner . <br /> 5b. Coordinate with School Governance Authority: <br /> Contractual/Fees arrangements with e l admen/T win <br /> Counsel . <br /> hed lin , Debi fin , on r(A t i on , etc . <br /> Materials use qualification . <br /> - Reporting process (clerk of works ) , Building <br /> Committee, etc. <br /> Construction supervision . <br /> Town planning authoriti } etc . <br /> - Any and all information obtained at Sept 241 1993 <br /> meeting . <br /> 6ba Develop conceptual design through an agreed design <br /> process so as to interface with Building Committee and <br /> all other authorities. <br /> `fib. Design i's to be Sensitive - o the fact that no Mashpee <br /> high hoo l exists and that the building reflect many <br /> aspects of town life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.