My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/3/1993 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
8/3/1993 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:13:04 PM
Creation date
8/10/2018 12:45:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/03/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> The Committee agreed that DRA must know about the changed <br /> location for the proposed aris center. Does the plan for the <br /> performing ar is center compromise that site as the hest choice <br /> for a highschool ? <br /> Dr. D Mou r . spoke with one of the developers of the arts center <br /> and suggested some type of combination with the school department <br /> but they did not agree , they want it strictly private. <br /> APPRAISAL <br /> Chairman Din.i i o explained p p l man & Paige contacted h i m <br /> regarding the appraisal contract. They think the Committee may <br /> have gone outside of the procedure; they should have issued an <br /> RFP for the services . M r. O' Leary has stopped working on the <br /> project. <br /> Tom talked with Town Counsel who suggested the appraisers <br /> contract can be worked into DRA ' contract, if DRA is amenable to <br /> that arrangement. Town Counsel will he faxing a letter today <br /> explaining that <br /> DISCUSSION WITH DRA <br /> Carl Franceschi and Gary Larson were present from DFA. They have <br /> met with their traffic consultants and geotechnical engineers, <br /> Traffic consultants - have reviewed access to the sites with DRA <br /> and they know the size of the proposed school They have <br /> information on some of the intersections and will he generating <br /> numbers in the next few weeks. <br /> The Rte 130 Great Neck Rd . intersection i l r dy under turfy a <br /> part o 1 the Costco pF oject a E 9 d is planned F o r signalization. <br /> The 151 site will also need signalization . They have information <br /> on trip counts from the Fields Point/Stop and Shop project, <br /> The traffic engineer will enumerate the positives and negatives <br /> of both sites . They will make recommendations as if both sites <br /> are being d v lop db <br /> Bill Jones asked i f , using the supplied demographics, can they <br /> 9-i ve the relative cost of busing the students, per mile? <br /> M r¢ Franc chi said they can work with the Superintendent' s <br /> office on that <br /> Guts-hn i a ` <br /> _ ��_ � � have worked� d �n the area before and have <br /> some shared information. The logistics of how to get on the <br /> property has to be worked out. The consultants (GZA) will draft <br /> a letter asking for permission onto the site, They do not have a <br /> problem sendin a 'letter saying they plan t be on the property <br /> on a certain date and unless they hear from the owner they will <br /> assure it is ok . They would like to know if the town feels <br /> comfortable with that approach <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.