Laserfiche WebLink
SURVEY <br /> Bob Fournier explained he received a letter from BSS regarding a piece of <br /> the <br /> 151 i owned by H , Dowson . some wetlands were identified where the <br /> sewage treatment plant has to be placed , at the northeast corner . This <br /> will be an issue with the DEP, They need to know the extremity of the <br /> wetlands. They received an estimate from Fru ro East, to flag the <br /> wetlands , for $400 . 00 , M r , sa 1 i en from SMMA would prefer to use Lel i to) but <br /> the cost would remain the same . They need committee approval to direct Mr . <br /> salien to proceed with this work. It is an added expense , outside of the <br /> contract. <br /> Ian said if we don ' t do it, we w 1 1 run into troub1 e. <br /> Merry sue made a motion to authorize the architects to contract to <br /> have the wetlands pinpointed , not to exceed $400 . 00 . B! l I Jones <br /> seconded the motion . All members were in favor ,** <br /> Mr . Fournier said they will also need permission to go on some of the land <br /> at the 151 site . They asked that someone get in touch with the owners to <br /> get the permission . <br /> Bob wh r i tenon r usually handles this issue . <br /> Merry sue made a motion to request Bob wh r i tenou r contact the 4 <br /> .property owners at the l 5 1 site to obtain permission to access <br /> their property for land surveying and hydro geol o i cal <br /> investigation . Bill Jones seconded the motion . All members were <br /> in favor . <br /> Ian will contact Bob wh r i tenon r with this request and the committee will <br /> send a letter, <br /> OLD BUSINESS <br /> Meeting with Performing Arts Center people on May 1st at 4: 00 p * m. <br /> Peter explained TK Thompson would like an advance copy of any site plans <br /> that have been developed before the meeting . <br /> Ray said the schedule calls for the completion of the schematic design by <br /> the end of Junes so we will have to have a clear direction by then ,, <br /> Peter also stated the committee should not go into the meeting with the <br /> assumption they can reimburse us for anything (shared facilities , roads , <br /> etc . ) The attitude should be this might be built in 10 years . <br /> Bill Jones said our role should be to preserve the potential for their <br /> center , if it is feasible . <br /> Peter agreed, but they have a plan that sites their facility already which <br /> has not been reviewed by anyone , They will not, however , drive our <br /> development . The site should be designed for what is best for the school . <br /> s creativity ,� 'pit <br /> Joe said there should be zero influence, we want sA , not <br /> Graham Gund ' s . O&P JL <br /> Bob Fournier said if that is the case, then w i s, not sense meeting with <br /> them. That is not the impression we want to convey to them. we want to <br /> accommodate their program as much as we can , even though we have to meet <br /> the needs of the high school first t <br /> Peter said the perception of the community cannon be that we are <br />