My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/14/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
6/14/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:10:53 PM
Creation date
8/10/2018 1:28:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/14/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> Nantucket, <br /> Ed said they can look at the price premium for a simple pitched vs . <br /> vaulted . <br /> Joe would like to know economically what is the best way to do it. <br /> Paul suggested they explore the architectural features of both roofs . <br /> The architect' s have heard our concerns , let them explore it; <br /> He would also like to see more detail of the front entrance . <br /> Tom does not see how the ship area looks like a ship. Maybe that could have <br /> a vaulted roof also, tie it in . <br /> Ian cautioned the committee to nave the architect' s down a certain path and <br /> then bounce alternatives otherwise you are all over the place . <br /> s ipence Labs- <br /> l floor they can share equipment better , improves idea of identifying l <br /> set of labs for the junior high win . Herne economics goes downstairs where <br /> it will be used for Leisure Services . <br /> --- 2 floors , they get more natural light far every room and you could divide <br /> them for the 2 grades . <br /> Bob Fournier added with all labs on the second floor , all the pipe is <br /> accessible from the first floor., <br /> Merry sue made a motion that a l 1 of the sc i ence l abs be 1 ocated on <br /> the second floor . Steve seconded the motion , All members were in <br /> favor 7-0 . **. <br /> Architectural f 1 ai r and character of the building . <br /> Peter and Merry sue like the different angles of the building , even if it <br /> doesn ' t look like a boat . <br /> Ray suggested it could represent an arrowhead . <br /> Ed reiterated what he bears as the consensus of the Committee : the <br /> following provisos to be accomplished within the des i gn development phase <br /> science labs on the second floor ., <br /> -- look at the geometry of the administration area the entry and the newly <br /> developed entry . <br /> -- look at the roof <br /> show the potential additions ., <br /> Paul made the motion that the Committee direct the architectural <br /> team to proceed with this layout subject to looking at the 5 <br /> provisos just listed by Ed F renette . Merry sue seconded the <br /> motion . All members were in favor. ** <br /> Ian is nervous about the timing of the value management workshop ,, It may <br /> have to be delayed 1 week . It can be discussed further at next week ' s <br /> meeting ,, <br /> SITE <br /> Dan sal i en explained he focused cri bringing the parking nearer to the <br /> building . There is row a road running around the building , providing <br /> access to the back baseball fields , which meet the requirements of the Eire <br /> Department. <br /> There are a total of 500 spaces 300 in the north section , 200 in the south . <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.