My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/1/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
2/1/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:03:18 PM
Creation date
8/10/2018 1:49:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cumulative knowledge of how to tackle a p ro4 ect like this one. <br /> Michael Pare asked about their computer networking and AV <br /> experience. <br /> BTA said they will have to use a consultant for that expertise. <br /> They worked with Perlin, from New yo rk on the IBM job. They will <br /> discover Mashpee' s needs and they find the best person to guide <br /> them. They did design the computer facility for Btoneh i l 1 <br /> College and used a team of computer consultants. <br /> Stere Creel i sh asked for a clarification of the relationship of <br /> the 2 firms, who will do what what are their current work loads <br /> and how will they impact Mashpee's project? <br /> M r. Ricci said they propose a joint venture. They will all be <br /> involved i n designing and construction documents phase work . BTA <br /> is seeking work because they are about to complete the Prudential <br /> job, All of the management people are in place and they would <br /> have to engage some of the people to do drawing and model work. <br /> They would enter into a contractual j o i nt venturei, <br /> Bill Jones asked if they ran a heat loss calculation on all the <br /> glass a the Bennington school? <br /> Mr, Green said they did, but it was built in 1970 when <br /> regulations and technology was totally different. I f it were <br /> built today it wouldn' t have all that glass. However, most of the <br /> glass was in the corridors. <br /> Bill asked how many CACI stations they have <br /> BTA has 2 complete stations and 3 people trained to operate them. <br /> Merry Sire explained Mashpee does not have a teaching staff to <br /> review plans, etc. what would be their* recommendation for <br /> researching the inside of the building - layout, materials etc. ? <br /> BTA said once they start working with Br, col l abro's program they <br /> can eas i 1Y bring in Osu a l images of what interiors could be. <br /> They would use input form Bolo O' Day, educational consultants <br /> They would do study models, to illustrate the relationship <br /> between interior spaces. <br /> Janice Mills said Mashpee needs expertise to work with the <br /> building codes and State regulations, are you familiar with those <br /> regulations or would you bring in a consultant? <br /> They responded that State building codes are what they work with. <br /> p <br /> They have read the state educational requirements carefully and <br /> spoke with the school board . They were concerned with the size <br /> of the project and the time allotment, when they put together <br /> their proposal they developed a timeline, to see if there is any <br /> lee war in the deadline . Every city has it own code requirements <br /> and politics and we learn to deal with i t. <br /> Joe Po l i to asked if any of the CAB operators were registered <br /> Architects? <br /> One is a registered architect <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.