Laserfiche WebLink
MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES <br /> THURSDAY; FEBRUARY 10 , 1994 <br /> MASHPEE MIDDLE SCHOOL <br /> Present,: Peter Di n i z i o, Merry Sue Ah l g ren , Sill Mart i ros , Joe <br /> Polito, Steve Gree 1 i sh , Bill Jones , MIichael Pare <br /> Also Present: Al Pol si , Clancy caffyn, carol Jacobson , Bob <br /> wh r i to nou r, Carol Jacobson re g Taylor <br /> Absent: Paul Griffin , Joan Avant-Tavares , Jayne Hendricks , <br /> Janice Mills <br /> STRE ALOVSKY & HOIT <br /> Present were Roger Ho i t, M r . Strekalovsky , Elan Bradford , Mike <br /> Hickey , consu1ting Engineer , Tori Arthur, consulting Engineer <br /> They explained St rea l os y and Ho i t have been in business for 16 <br /> years . M r. Ho i t had 15 years of previous e perience. They have <br /> worked on 300 pubtic education project, it is their specialty , <br /> They are very proud of their record of bringing projects in on <br /> time and on budget. Theme projects also have a minimum of change <br /> orders , The Mash pee Middle School addition project is an example <br /> of that. The firm employs 15 people, 7 are registered architects , <br /> M r* Ho i t and project architect Ilan Bradford are the team Mlashpee <br /> would work with through the e n t i r"e p ro J ect, giving continuity to <br /> the job. They are proud of their knowledge of the GESS process, <br /> which funds projects. of the 64 projects funded by the State <br /> 1 astyear a 12 were Streal osky and Hoi t projects. <br /> Tom Arthur i s a principal at a 16 person structural engineering <br /> firm founded in 1970, They have worked with S & H since that <br /> time. Their f i rst project together was Braintree High School in <br /> 1970 . They have worked on over 20 high school projects , - new <br /> construction and renovation and 180 school projects. They have <br /> worked with S & H on many of those pro *ects . It i's important the <br /> team is cohesive and know how each other thinks . S & H brings <br /> the structural engineer in early in the process. Some firms <br /> design in isolation and then come to the engineering consultant <br /> and this leads to complications. That is not the case here . <br /> These two firms have a very good working relationship. They <br /> worked on the Middle School addition and on the original Mashpee <br /> Middle School . They have done many projects on the cape and are <br /> comfortable in this environment. <br /> Mike Hickey from Crowley Engineering represents a 35 person <br /> mechanical and electrical engineering firm. They have also <br /> worked with St ref a l o s y and Ho i t many times. They have worked <br /> on over 100 school projects, new and renovations, and many other <br /> major projects. Their biggest school project was a 35 million <br /> high school . They have a lot of high school experience, They <br /> work closely with town inspectors and town departments to <br /> determine what the town standards are . They provide the same <br /> staff through the entire process. They look for energy savings. <br /> 1 <br />