My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/10/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
2/10/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:04:41 PM
Creation date
8/10/2018 1:51:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/10/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Peter said Sept, 1996 is our .goa l for opening of the school but <br /> we will not sacrifice quality of the building. The committee i s <br /> shooting for that date but people assure we will be cutting <br /> corners and the building won ' t last, <br /> Mr. Flockhart stated they did a project in Lowell , 500 ,000 sq <br /> feet of renovation , o million , They were hired i n February to <br /> submit drawings for June 1 and they were able to do i t. They d i d <br /> that simultaneously with the Ma rthas Vineyard High School project <br /> - they did them bothd <br /> David Finney added that you have to identify the political <br /> constituencies , so no one is left out. Design Partnership will <br /> want to know if i t is going to take longer for the community to <br /> come to a consensus, That has to be identified up front, <br /> Community issues will make the project tale longer. . <br /> Steve Greellish said he got the impression they have a lot of <br /> irons in the fire, what is your work load?, <br /> Mr. Flockhart said Drakett high school is their biggest project, <br /> It is in the construction document phase and will be completed in <br /> mid May, when Mashpee will be in the design development phase ; <br /> Construction document phase is labor intensive, while the <br /> schematic design for Mashpee is mostly work with the principals <br /> and associates . <br /> Steve asked about their CD capabilities. <br /> Mr. Constable s i d they are 75-80% on computer, They have <br /> introduced it gradually, <br /> Steve asked if they can give us a wa1 th rough , an animation? <br /> They said they can . <br /> Michael Pare asked if they do all high tech work in house or use <br /> an outside consultant? <br /> They do all educational technology in house . The owner may want <br /> training and they would use a consultant. <br /> Bill Ma rt i ros asked if a large field house i s desirable over 2 <br /> gyms? <br /> M!r. Flockhart said a large field house is more desirable. <br /> Mashpee does not have a large enough student body. <br /> Bill asked how many sq feet were cut from D r. co 11 ab ro#s ed specs <br /> with their suggestions <br /> M r. Flockhart said he did not look at that total sq feet, jus the <br /> individual examples * <br /> B1411 mentioned to them that the state may cut the student boder <br /> back to 1180 , because they only will consider 5 year projections . <br /> Mr, Flockhart said that is the first time he has heard that. <br /> Until now, they would only consider 10 year projections, <br /> Bill asked if is desirable to have the superintendents office in <br /> the high school and how much space should be allotted for that'? <br /> They did not have enough information to answer that question , i .e <br /> size of staff, etc. <br /> Fancy caffyn asked if the swimming pool at Marthas Vineyard was <br /> approved? <br /> 1l . <br />
The URL can be used to link to this page
Your browser does not support the video tag.