Laserfiche WebLink
Merry sue Ahlgren asked what kind of materials do they see going <br /> i n to make the buildi ng comfortable for teachers and students? <br /> Mr. Flockhart said they suggest a lot of natural light, but in a <br /> controlled fashion . Carpets , but must first identify the wet <br /> areas . For Marthas vineyard, they did daylight studies to get <br /> the light angles to know where in the room to put the chalkboard. <br /> Laser Board is a very unique product - markers can be used and <br /> erased and you can project on i t. <br /> Bill Jones said this was a very refreshing discussion. They are <br /> the first group to start by talking about education ; he was very <br /> impressed with i t. His concerns are the energy efficiency of <br /> this building - not at today 's energy costs . over the life of <br /> this building there will be very different energy costs, Have <br /> you given thought to energy efficiency as part of the <br /> configuration of the building?. <br /> M r. Flockhart said there are many choices and balance is needed. <br /> In Marlboro they designed a very compact building, like an office <br /> building, reducing the exterior surf ace and making it more ene r g <br /> efficient. However they had to air condition it because of the <br /> Feat build up. They have designed classrooms w i grout windows, but <br /> ■ i + r ■ <br /> without windows you need air conditioning . There are vent i 1 at on <br /> requirements in school that are not needed in office buildings. <br /> At Martha's vineyard high school , they requested a southerly <br /> orientation but on the other side of the building it is a <br /> northerly one. <br /> Peter Evans said there are autocratic light dirimers that work with <br /> daylight, Utility companies fund some of these things, offer <br /> rebates , but it i s h i t or miss . <br /> There are architectural materia1s to be used. T hey use more <br /> insolation than the code requires. They will do feasibility <br /> studies to show the payback, <br /> Peter D i n i z i o asked for their most recent, new project completed? <br /> In the last 15 years there has been a swing away from new <br /> construction, The majority of their work is addition and <br /> renovation . The Marthas vineyard and Rockport projects are the <br /> same scope as hash pee ' s . Addition and renovation is more <br /> difficult than building a new building. <br /> Rockport would be the best example for Mas hpee to view. It was <br /> p <br /> 105 , 000 sq feet of new construction , A $13million project with <br /> only 1 change orders., <br /> They have done elementary schools in Swansea and Greenfield " <br /> Mr, Flockhart designed Methuen and Marlboro high schools while <br /> with F l ansbu rg, <br /> Mr. D i n i z i o asked if they ever had any lawsuits against them? <br /> They have not, <br /> Peter said he was very impressed with David Finney ' s persistence <br /> in getting this interview scheduled , How would they use that <br /> r <br /> attitude to Deep this project on track and moving along? <br /> M r. Pinney stated with aggressive scheduling . The milestones <br /> have to be spelled out and met* <br /> 10 <br />