My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/10/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
2/10/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:04:41 PM
Creation date
8/10/2018 1:51:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/10/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e <br /> s i gnat i at i on of the intersection? <br /> -- Zone II of the PI well- should be looked at early on and start <br /> investigation as soon as possible. <br /> -- { uashnetirer - water dual i ty, fishery, Keep as wide a buffer <br /> as possible,. <br /> Delineate the wetlands. <br /> Arts center site. <br /> These areas ea were outin d on a diagram a d he remaining area, <br /> about 60 acres, Mr. # a l 1 st 1 o said is adequate for the program <br /> proposed . With shared access to h arts ceneF it gets t 1 ghterâ– <br /> With no arts center there is a lot more flexibility to move the <br /> playfields, You want to stay as far away from the river as you <br /> a 1 <br /> can and minimize the impact of parking on the site. <br /> David Finney spoke of the process schedule and presented a <br /> proposed schedule. The goal is occupancy for Sept. 1996 . He <br /> noted the concern of not submitting plans for the June 1 state <br /> deadline. He said you do not have to wait to file until the next <br /> June. They have been submitting any time up to the next spring <br /> you will not loose mush time, construction can follow at the <br /> sags schedule , it will just be 1 year later when you start <br /> getting your first reimbursement payment. <br /> They proposed the design phase to be 7 months, 3 months for <br /> preliminary and site exploration , time for MEPA submission , <br /> public resentat i on of work in process and review by other <br /> regulatory agencies with jurisdictiona <br /> Ordering , procu rement and installation of equipment w ' 11 occu r <br /> the summer before sept 1996 . <br /> Construction Services Department - ars architect from this <br /> de a r tm nt takes the project all the way to the end. A principal <br /> of the firm heads this department, working with the principal i n <br /> char e. The do the site visits , up to and through the punchlist <br /> and occupancys <br /> They tape the owner through the project budget. Prepare a cash <br /> flow budget, showing the towns ability to pay . <br /> They have a good track record for keeping projects on budgeter <br /> They presented a chart on change orders for past project, it is a <br /> very tight number. <br /> QUESTIONS <br /> Joe Polito asked what a standard amount of high tech; is for each <br /> classroom which allows each student the ability to plug in, that <br /> we can afford to do? <br /> t s after i t i s plugged i n <br /> Per Constab 1 e said what happen <br /> e <br /> determines a lot of cost into a network, interactive TV, <br /> network modem etc. It i's difficult to determine. Mr. Flockhart <br /> said we can tell you what each piece will Dost. You have to <br /> examine the function and how often are teachers going to us these <br /> unitsHow difficult would it be to swap a classroom, upping the <br /> utilization of the equipment? Get the best allocation of those <br /> dollars. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.