Laserfiche WebLink
The Committee reviewed the revised administration area. <br /> Ray reviewed two sketches with the Committee , one triangular and the second <br /> more rounded administration area. <br /> He thinks the triangular one works better than the rounded one . It is <br /> harder to control the access in the rounded on . He reviewed the layout of <br /> where the offices would be . <br /> The very "tip" of the triangle space would be cut off somewhat. <br /> The triangle version works well on the first floor layout and the media <br /> center on the second floor is terrific . The program spaces line up well . <br /> The rounded version is more costly because it is a curved structure . <br /> The health suite has been enlarged a little . <br /> The Committee reviewed the models of the 2 version to see what it means 3 <br /> dimensionally . <br /> Merry Sue noted there is a lot of southern exposure glass . <br /> Ray agreed , there is a lot of glass . They will look at it. <br /> Peter said they visited a school with a lot of glass and it was breaking <br /> because of the structural stress . <br /> Ray said they would structurally isolate the curtain wall from the building <br /> structural system. <br /> The Committee discussed concerns about the glass . <br /> Paul said he likes glass but has found other school systems that have <br /> problems with glass. <br /> Aesthetically , Janice loves the glass , loves the sunlight. <br /> Merry Sue ' s concern is the heat generated , will we have to put shades on <br /> it, <br /> Joe would like to look at simplifying the lines . Only one slope on the <br /> roof . He would like to see a simpler looking building . <br /> Peter does not want to build something that will look dated in ten years . <br /> Ray agrees . Once they have the chance to put it together , the Committee <br /> will see all the pieces fit. <br /> Bob said there seems to be a general consensus for this approach and we <br /> will develop this further and come back with variations. <br /> The Committee reviewed and discussed the site plan . <br /> NEXT SCHEDULED MEETING: JULY 12 , 1994 4: 00 P. M. <br /> Minutes submitted by Arden R . Cadrin <br /> 7 <br />