Paul suggested talking about other issues related to this before making a <br /> decision . <br /> Peter asked Tory why you save $350 , 00 by going the way he suggested" <br /> He responded because you are using the materials that are there and you <br /> eliminate all the steel frame by adding a little Cason ry support. <br /> Peter asked Tony if you use hi's suggested method will you have concrete <br /> block between the classrooms making it is i millovab 1 " <br /> Tony ai it is a question for MMAO <br /> 02-4 - roof canopy at main entry . G & P agree if it does not become a <br /> weather issuet. <br /> Marry Sue wants to see the re-design before deciding . <br /> t a i dcanopies at other school they v i i ted were steel needed to b <br /> painted and when not maintained looked terrible . A concrete y ter-n would <br /> weather better from a maintenance point of view . <br /> Paul said it would need a lot of concrete to support it and the cost would <br /> go way up d <br /> *The Committee agreed to ask the architect to look at precast structure so <br /> there i not a lot - pd st l <br /> 02-5 - G&P recommend reducing corridor space wherever possible. S114MA <br /> should look at this particular area sand come back to the Committee . <br /> Merry Sue has a problem with the way the first floor i designed and if you <br /> take the corridor away it will be ever weirder - how will you get au it. it <br /> is awkward . <br /> *The Committee agreed to a,9k SMMA to investigate reduc i n co rr ii d r , wh i 1 e <br /> maintaining natural light . <br /> 0 - -- Roof at classroom b1ock using i rig 1 e not double pitch . Issue Sh u 1 d <br /> be re-addressed . <br /> 03-1 &P recommend a double layer of GWB with a skim layer o f p l a ter- a on <br /> the walls which face exterior . Take out the block , use steel studs and 2 <br /> sheets of drywall with skim coat of plaster -for a �� , 000 savings . Tf)a <br /> exposed space is only between the windows . It makes putting in the windows <br /> cheaper . <br /> Peter had a concern about the skim coat:, At Rockport it was all dented and <br /> peeled off* <br /> Paul said i tp robab l y wasn ' t skim coat. You will get sound benefit from <br /> the drywall vs . block , The Committee ag reed <br /> 03---2 - Reduce the skylighting where possible . *Everyone agreed <br /> 03-3 Bluestone in entrance lobby and all main vestibules . G&P suggested an <br /> entrance mat instead , it wi 1 l tale sand and mud off shoes and won ' t be <br /> slippery . <br /> 03-4 -- Roof design Issue . Ask SMMA to review it . <br /> 03-5 G&P d i sa ree and ask SMMA and Chartwell to look at longer 1 3 f <br /> materials . <br /> Ia.n said <br /> cedar can weather naturally , Nauset looks good . Cedar panels will <br /> last 45-50 years at least. <br /> Paul does not think they look good . Joe said they don ' t have the sQa18 we <br /> re looping forA <br /> Paul said there are a lot of good , inexpensive b1ock irate r 4 a 1 s wh ch can be <br /> used in the back of the building . Why consider wood products that are <br /> subject to ria i n tenan costs? <br /> Paul asked Ian and SNIMA to review the different life cycle costs of the <br /> different exterior products . <br /> 3 <br />