My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/9/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
8/9/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:12:25 PM
Creation date
8/10/2018 3:07:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/09/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
He suggested leaving it as an option and during negotiations with Fields <br /> Point they can see if it is an issue . <br /> Peter polled the Committee on what they would like to see for a setback <br /> behind the track/football field . <br /> Janice said for economy- o ft. Joan -- 30 f t f <br /> Merry sue agreed 30 ft. Michael 30 ft . <br /> ,doe - 30 ft . Peter 30 ft ' <br /> Paul -- 30 feet , <br /> Bill - at least 50 feet . <br /> Ian suggested going for more initially , you can then compromise. <br /> 30 ft i s probably enough but leaves no room for negotiation . <br /> The committee agreed the slope may be a natural boundary . The tradeoff can <br /> be the Committee takes a portion behind the trach and gives -the perform! ng <br /> arts center more by angling the line ( towards old Barnstable Rd . ) . <br /> Dan will check with Fields Point if he can share the drawing BSS prepared <br /> for, them with the committee which documents conservation land on the <br /> eastern boundary . <br /> Dan explained preparing a land acquisition plan i s not under the scope of <br /> services of the SMMA contract . The Committee should discuss that with the <br /> architects . It would be a small additional expense for BSS to prepare a <br /> land acquisition plan .' <br /> Paul will discuss it with Bob Fournier t <br /> Dan said the Committee wi 1 l have to come up with collective recornmendati ons <br /> on distances from parking to the building , He is getting rrri ed messages . <br /> He is hearing that it is too far but what is too far? <br /> Joe wants there to get people closer to the front door . If you don ' t people <br /> will park in the fire lane , <br /> The Commttee reviewed this area. <br /> Dan said from the last park i ng space to the f ron't door i s 350 feet, about a <br /> minutes walk. It is as tightly compressed as you want it to be , <br /> Paul said it is a rural setting , You don ' t want it to be a stop and shop <br /> with parking right up to the door . He does not want to see cars when you <br /> lock out of the windows.. <br /> Merry sue agreed you don ' t want to see the parking lots any closer . <br /> The previous plan green space was 85 feet, this new plan it has been <br /> reduced to 45 feet , what would the committee prefer? <br /> Janice - 80 ft. Joan -- 80 ft <br /> Merry sue - so ft Mike- 80 ft <br /> Joe- 40 ft Peter 80 ft <br /> Paul 80 feet Bill - Bo f t. <br /> Dan will make it 80 feet . <br /> Discussion with Board of Health agent Elias 1cuai d re : sewage Treatment <br /> Plant. <br /> E 1 i as explained when reviewing the schernati c design spec he paid particular <br /> attention to the STP. He suggested someone should look into actual flow <br /> vs . CEP projected flows for schools , The Sandwich elementary schools <br /> actual flows are only 1 /3 of the DEP estimated flows . <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.