My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/30/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
8/30/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:15:06 PM
Creation date
8/10/2018 3:09:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/30/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
academic wing : they paired the windows to avoid repetition , <br /> There will be a window on each end of the classroom with wall <br /> space in between . <br /> How much more expensive i s the brick? <br /> Fd said the u r rent estimate i s for all wood , <br /> For block and woad- $80 , 000 more. <br /> For all brick - $280 000 more . <br /> There is no question brick wi l 1 out per-Iorm wood , <br /> Ed Fr nette said they recommend the brick as a value add . They <br /> think it is worth it . <br /> Joe said they should add the operational costs associated with <br /> replacing the other products (wood or vinyl ) to the formula . <br /> Bill Hauck said the. quality of brick today is not good . They have <br /> to spec a quality brick ., <br /> Janice asked what made, them change their minds? <br /> Ed said they 14ke the brick building but th_i n k they were -v r l y <br /> sensitive to the cost IssuEl' . <br /> Paul as keel if there is a cheaper a l torn t i v Maty r i a l to use on <br /> the back, side off~ the hu i l d i ung <br /> Ed said they don ' t believe there is a back-side to the building <br /> but they can explore it,, <br /> Ed sal d they plan to use a 4 x 4 rick,, , it make-8 a nice scale <br /> on a large building . <br /> Joe asked what it would cost to use regular size br i cks9 <br /> Ian said it would probably add another $.1.50 , 000 . <br /> Janice made a motion to accept the brick 1node l /concept <br /> -for the exterior of the high school . Paul seconded the <br /> motion , All members were in favor . <br /> Tori Fuda1 a agreed the cafeteria looks weird . <br /> Joe thinks it is ugly . <br /> ROOFS <br /> The central core/shared facility area has a gabled roof <br /> The academic wing has a shed roof . There is a different slope on <br /> an area that connects the two. That allows them to do a gabled <br /> roof <br /> Gym (with pool shown on the this scheme) i s a p s i t i v� slope roof <br /> which drains to the middle . <br /> Paul said the Committee has concerns with flat roofs . What w i l l <br /> they do to el i m i n to the typical problems of a flat roof? <br /> Ed said i t. will be engineered to carry off any potential water <br /> thaIC, VIOUld er,d up on the roof . Thle will have to put ove rf l o��s <br /> on i t . There i s no roof they can put on that loion ' t require <br /> Ma intenance . They think this roof is reasonably maintainable and <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.