My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/1/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
11/1/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:20:49 PM
Creation date
8/10/2018 3:18:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
complete the archeological study and traffic study on time. <br /> Paul asked what extra work is involved for this $20 , 500 proposal' <br /> Bob <br /> said most of the fee is for the additional bidding phase and additional <br /> construction administration phase, They also hive to pr4�v-* fe a temporary <br /> storm drainage system, ' <br /> Paul said $20,000 divided by the rate per hour is quite a lot of hours. He <br /> is having a Lard time understanding i t. flow does this become extra work, <br /> site clearin and grubbing was part of the original construction schedule . <br /> Ed said thi' s proposal includes additional administrative work and <br /> observations for a longer period of time. <br /> Paul understands there is additional administrative work but not $20 , 000 . <br /> He cannot approve an extra $20,000 . <br /> The committee will continue this discussion at the net meeting , Bob will <br /> provide further backup material supporting the $20 , 000 . <br /> Bu irl LJ w <br /> Paul received a letter form the Town Treasurer saying $70 , 000 i s needed for <br /> insurance on the debt. Paul asked , when the budget was being prepared , if <br /> there were any additional costs to the Town to borrow the money and was <br /> told there would be none . He will talk to Mr , whritenour about this . <br /> Joe sai d he is very concerned there will not be enough money for the high <br /> tech equipment, There on 1 a little over $1 million to equip the school <br /> with technology ,, <br /> (J oe Polito left the meeting 6 :00 p*m. <br /> a document with the cost reduction ori r~ecommendat i ons from the <br /> MA prepared <br /> Oct 25th mooting , including the corrected savings associated with each and <br /> the items that were ted at that meeting , Page 4 are some additional <br /> m accepted <br /> recommendations . <br /> Bob said the goal is another $600 ,000 of sav i ngs . <br /> Paul talked about the goal . Last week many of the value added items were <br /> crossed out we treed to come up with additional savings . <br /> Merry sue said she would like to see this number come down to the $20 <br /> million budget and then the committee could put thins back in . The <br /> Committee only truly agreed on the brick as a value added <br /> Ed Prenette m request made a est of the Committee, SMMA had certain insight on <br /> � <br /> what this building probably would cost, based on histories . He does not <br /> blame anyone for not believing in those histories. The state funding system <br /> is geared for a very basic building - any substantial technology or play <br /> fields is up to the community. <br /> at everyone try to reach consensus u s on the price as expeditiously <br /> He asked th , <br /> as poss i b l e , try to get th rough this list* They have spent ��� of the i r <br /> administrative budget on Design Development phase. He asked please, as a <br /> 'end to tryto reach consensus as quickly as possible. This is very <br /> friend, <br /> expensive for SM A. <br /> Bill a rt� nos <br /> ' asked if the auxiliary gym is part of the teaching stations? <br /> Paul explained the problem, for MMA to meet the goal in the contract, i t <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.