My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
12/13/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:25:00 PM
Creation date
8/10/2018 3:23:19 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/13/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Paul asked , if at any time in the future we want to put up a wall , does it <br /> make a difference which layout we choose? <br /> Phil said it does because of the location of the doors. <br /> Steve suggested they also as D r. Del ou ra if it is worth keeping the space. <br /> Joe will tate the 2 sketches to D r. DeMou ra and Gus Fredricks . <br /> Library Area - spatial arrangement reviewiibrary <br /> There was concerns from Childs about the layout, about stacking and <br /> seating being intermixedir <br /> They presented a. sketch of a scheme to resolve that. <br /> This ro osa l pushes the rooms out to the atrium side which results i n the <br /> stacking space being wider. <br /> One obstacle was the location of the elevator so they propose moving it to <br /> the front lobby , j east of the front door. <br /> They will be working with Manny Tavares to refine this. They see an <br /> integration of stacks, seating and technology,. <br /> Phil said there will be improvements to the first floor that they do not <br /> et have drawings for . The principal ' s office shifts back , the elevator <br /> moves and the secretary/reception area is larger ., <br /> Phil suggested dialoging with Dr, De ou ra ori these changes and they will <br /> send him copies of the sketches . <br /> Merry <br /> Sue and Janice do not want Dr . DeMoura to make the final decisions . <br /> Th <br /> sketches can be sent to his office for committee members review. <br /> omi ss i on of <br /> second floor ceiling . Phil said eliminating the ceiling will <br /> volume to the ace but will l require up sizing all unit ventilators to <br /> add � � <br /> the next size. They do not have a price on that. He does not think there <br /> is necessarily a cost savings, <br /> Ed added they <br /> will then have to organize the elements more carefully and It <br /> may become difficult. They would prefer to leave the ceiling in ., <br /> The Committee agreed they can proceed that way L <br /> Paul explained he talked to Phil about the possibility of using the 1 i brary <br /> as a. central library in the future. You could use the back exit and create <br /> F <br /> � f <br /> a second reception area for after hours use, If the bu 1dn i <br /> s open at <br /> night, then it is not a problem. <br /> Phil told Joe he will speak to Bill Hauck about the egress . He feels there <br /> is no question it mous the building code,. <br /> They looked at the effect of a 3 hour wall in the auditorium. Ph i 1 feels <br /> i t i s not a b i g deal , j ust a. utter of spray proof i ng the col umns A <br /> A 3 hour r wa11 was never discussed for the cafeteria/kitchen , The k i tchen <br /> has a 1 or 2 hour wall . <br /> -They added another egress to the auditorium# so it now has 4 means of <br /> egress RF w ill review it with the Building Inspector . <br /> Joe asked how costly is the Point? <br /> Paul said it is a done deal . <br /> Joe asked about the atr i um space at the end of the stair wells in the <br /> academic wings , is there any cost savings in eliminating them <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.