They now have temporary town water on site . Previously Stone had been <br /> trucking it in <br /> Construction Progress issues : stone is asking for 4 weeks to complete the <br /> fields but Paul told them that was not acceptable , they must have it <br /> complete in 2 weeks , <br /> On Friday ( 9/15 ) stone will have all steel shop drawings to SNDA, have a <br /> response to the request to improve the steel erection time and answer about <br /> expedi-ting production of steel . <br /> WASTEWATER TREATMENT PLAIT <br /> Last Friday there was a meeting regarding the WWTP. The most important <br /> issue , for the Town to complete , is the operation and maintenance manuals, <br /> The IEP discharge permit requires it be overseen by a. professional <br /> engineer. This committee needs to look to the services of a, professional <br /> for this . <br /> They also discussed who i s responsible for the cost of operation for the <br /> first year. It was concluded this committee should retain that <br /> responsibility. <br /> Steve explained it is probably better to assume that cost for one year <br /> before turning it over to the school , <br /> Peter thinks that makes sense , the school Department does net have much <br /> experience in running sewage treatment plants . <br /> Steve explained this Committee must contract for operation of the plant and <br /> for sludge hauler, which probably won' t be used the first year. The <br /> contracts for this work have to be developed . <br /> Omesh Kunar from Woodard and Curren was present . <br /> Paul said the committee bought inspection services from Woodard and Curren, <br /> does that include helping to prepare the manual? Mr. Kunar said it does <br /> not. <br /> Joel would like to discuss what DEP requires from the manual . <br /> Steve said it is nebulas at this point . It should included what DEP grants <br /> the town to test for. The committee should have an active role , and needs <br /> to advocate for what we feel and agree is really needed @ <br /> It should include micro scaling of experiments , handling of chemicals, <br /> science lab. A plan on how that will be implemented during the school year <br /> must be included within this manual <br /> Mr. Kunar explained. that DEP wants the manual prepared by a. engineer. The <br /> contractor will give you the original manuals for individual pieces of <br /> equipment . The engineer has to coordinate that and provide a, detailed <br /> operational plan for different scenarios of operational occurrences so an <br /> operator can implement its <br /> The grade of the operator and number of hours to be spent at the plant is <br /> all to be spelled out . <br /> Mr. Kunar said there is enough information in the design and. DEP permit to <br /> begin procuring an operator . <br /> Paul explained realistically we don' t need someone on board until we ask <br /> 2 <br />