Laserfiche WebLink
-figure came down to $18 , 685 , The tasks included are: contract documents , <br /> sped i^i cati ons, change to the base bull di ng drawl ng - word i nation , <br /> bidding- printing , administration, tabulation , mailing , construction <br /> administration. <br /> Construction administration covers a 4 week period total of 50 hours for a <br /> civil engineer. <br /> Paul thinks that is excessive , the entire Job 1*s only 160 hours . <br /> Joel explained the proposal i for site clearing and erosion contro1 , they <br /> will install part of the storm drainage system. You can ' t clear without <br /> erosion controt . <br /> Paul thinks is it slightly but not excessively high . I t w i 11 buy the <br /> project 4-6 weeks. It may be the window needed if there is any work <br /> stoppage or weather problems. It is a small amount of money compared to <br /> paying overtime because the project i running late in the end . He feels <br /> it is money well spent , it buys insurance . <br /> Ian said the proposal seems on the high i de. It i's difficult to determine <br /> what amount might have been included i n the original contract for this <br /> work . <br /> Joel explained for the civil engineer they determined what would have been <br /> needed under the basic services and subtracted that, They put a lot o <br /> thought into thi's thisproposal . <br /> Paul rade a. motion to ask SMMA to proceed with the additional <br /> package for clearing and grubbing , based on their proposal o <br /> $18 , 685 . 00. Merry Sue seconded the motion . All members were in <br /> favor 6-0 <br /> Steve said it should be in the contract that the contractor keep the <br /> woodland loam on site - do not remove it. No top oil is to be removed . <br /> Next week ' s Agenda: <br /> Joel thinks Ed Prenette is prepared to bring in revised elevations. If <br /> they are not, the Committee would like to know ASAP so they can cancel the <br /> meeting . <br /> Paul suggested discussing the open items n technology : 1ibrary , training, <br /> schedule of hiring staff, grounds equipment. He would like to see a <br /> schedule of what students will be in the building when . These issues have <br /> to be discussed with the School Committee also. The Committee should <br /> develop an action list. <br /> LAND ACQUISITION <br /> Paul said the title was transferred last week . Town Counsel said he felt <br /> it was a very comprehensive appraisal . It will be hard to bring it to court <br /> and claim it was a bad job. <br /> Ian presented a cash flow schedule for construction . <br /> Paul had reviewed it previously and rade some comments. Ian w i 11 make <br /> those revisions , <br /> Ian said a letter was supposed to go to Tern Counsel from SMMA regarding <br /> R ' fee? <br /> Joel said it went out today. <br /> 9 <br />